2008
DOI: 10.1016/s1568-2692(08)80033-2
|View full text |Cite
|
Sign up to set email alerts
|

Chapter 31 Sensitivity and spin-up times of cohesive sediment transport models used to simulate bathymetric change

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1

Citation Types

0
1
0

Year Published

2008
2008
2023
2023

Publication Types

Select...
3
2

Relationship

1
4

Authors

Journals

citations
Cited by 7 publications
(1 citation statement)
references
References 23 publications
0
1
0
Order By: Relevance
“…It may be that a spin-up period of two months was not sufficient to remove the initial bathymetry irregularities and thus for the model to reach a quasi-equilibrium situation between morphodynamics and hydrodynamics. The mismatch between the initial bathymetry configuration and the forcing conditions has been identified by many authors as one of the main source of uncertainty in morphological modelling (Schoellhamer et al, 2008;Amoudry and Souza, 2011).…”
Section: Mean Maxmentioning
confidence: 99%
“…It may be that a spin-up period of two months was not sufficient to remove the initial bathymetry irregularities and thus for the model to reach a quasi-equilibrium situation between morphodynamics and hydrodynamics. The mismatch between the initial bathymetry configuration and the forcing conditions has been identified by many authors as one of the main source of uncertainty in morphological modelling (Schoellhamer et al, 2008;Amoudry and Souza, 2011).…”
Section: Mean Maxmentioning
confidence: 99%