Proceedings of SPE Asia Pacific Oil &Amp; Gas Conference and Exhibition 2006
DOI: 10.2523/101109-ms
|View full text |Cite
|
Sign up to set email alerts
|

Changes in Completion Strategy Unlocks Massive Jurassic Coalbed Methane Resource Base in the Surat Basin, Australia

Abstract: TX 75083-3836, U.S.A., fax 01-972-952-9435. AbstractSince the late 1990's, operators have drilled a number of coalbed methane (CBM) core and exploration wells to define the gas resource potential of the vast and relatively unexplored Jurassic Walloon Subgroup (SG) in the Surat Basin. Unfortunately, early pilots used completion techniques that failed to fully assess the true potential of this reservoir. Firstly, openhole completions were trialed but had limited success because of fines influx and well collapse.… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1

Citation Types

0
1
0

Year Published

2009
2009
2018
2018

Publication Types

Select...
4
1

Relationship

0
5

Authors

Journals

citations
Cited by 5 publications
(1 citation statement)
references
References 8 publications
(10 reference statements)
0
1
0
Order By: Relevance
“…Generally, hydraulic fracturing resulted in low productivity wells in the early pilot areas of the Surat Basin and produced wellbore failures in the Undulla Nose area, which led to the development of an alternative under-reamed, open-hole completion as the primary completion method for WSG wells (Johnson, Scott and Herrington 2006). However, as appraisal programs moved away from the more prolific Undulla Nose area, some areas of variable and lower permeability were encountered; this required reevaluation of the traditional WSG completion method and consideration of implementing hydraulic fracturing to improve production.…”
Section: Introductionmentioning
confidence: 99%
“…Generally, hydraulic fracturing resulted in low productivity wells in the early pilot areas of the Surat Basin and produced wellbore failures in the Undulla Nose area, which led to the development of an alternative under-reamed, open-hole completion as the primary completion method for WSG wells (Johnson, Scott and Herrington 2006). However, as appraisal programs moved away from the more prolific Undulla Nose area, some areas of variable and lower permeability were encountered; this required reevaluation of the traditional WSG completion method and consideration of implementing hydraulic fracturing to improve production.…”
Section: Introductionmentioning
confidence: 99%