2013
DOI: 10.1016/j.fusengdes.2013.03.026
|View full text |Cite
|
Sign up to set email alerts
|

Challenges of ITER diagnostic electrical services

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1

Citation Types

0
1
0

Year Published

2013
2013
2013
2013

Publication Types

Select...
1
1

Relationship

1
1

Authors

Journals

citations
Cited by 2 publications
(1 citation statement)
references
References 1 publication
0
1
0
Order By: Relevance
“…The Loom Jacking tools will be secured to existing threaded holes located in the welded rails used by the blanket cooling manifolds and "Edge Localized Mode" (ELM) coil support. [2] III. ASSEMBLY AND INSTALLATION STRATEGY The major design choice of the in-vessel electrical services was to pre-fabricate the loom, rather than individually install cables.…”
Section: Design Of the Conduit/loommentioning
confidence: 99%
“…The Loom Jacking tools will be secured to existing threaded holes located in the welded rails used by the blanket cooling manifolds and "Edge Localized Mode" (ELM) coil support. [2] III. ASSEMBLY AND INSTALLATION STRATEGY The major design choice of the in-vessel electrical services was to pre-fabricate the loom, rather than individually install cables.…”
Section: Design Of the Conduit/loommentioning
confidence: 99%