2022
DOI: 10.3390/buildings12050511
|View full text |Cite
|
Sign up to set email alerts
|

Central Load-Bearing Control in the Construction Process of the Concrete Spherical Joint Nandu River Swing Bridge: A Case Study

Abstract: The rotating mechanism is a significant procedure in swing bridges. In this paper, the Nandu River swing bridge is taken as an engineering case study to exhibit the critical technology of the monitoring process and the construction method of the swing bridge. The research focuses on the central load-bearing control system used to guarantee the security of the construction process. The mechanical problems during the construction process are discussed. Simultaneously, the cable tension and gravity center test ar… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1

Citation Types

0
1
0

Year Published

2022
2022
2024
2024

Publication Types

Select...
4
1

Relationship

1
4

Authors

Journals

citations
Cited by 5 publications
(3 citation statements)
references
References 19 publications
0
1
0
Order By: Relevance
“…The Hertz contact problem is one of the common problems of contact interaction between an indenter and a half-space [49]. Figure 5 shows the contact interaction scheme between a spherical indenter and a half-space.…”
Section: The Hertz Formulationmentioning
confidence: 99%
“…The Hertz contact problem is one of the common problems of contact interaction between an indenter and a half-space [49]. Figure 5 shows the contact interaction scheme between a spherical indenter and a half-space.…”
Section: The Hertz Formulationmentioning
confidence: 99%
“…In the planning and construction of bridges, it is inevitable to cross roads, railroads, valleys, rivers and other terrains, bridge construction is disturbed by special terrain, bridge swivel construction technology is an effective method to solve this problem [1]. To reduce the risk of overturning and ensure the safety in the bridge swivel process, weighing tests are performed before bridge swivel, the whole process is monitored during bridge swivel [2]. The spherical hinge rotation method is often used in bridge swivel, the jacking force is used to push the spherical hinge to rotate.…”
Section: Introductionmentioning
confidence: 99%
“…Buildings, such as roads [1,2], bridges [3,4], and houses [5,6], require a large number of constructive resources. Utilizing construction and demolition waste (CDW) is crucial for the sustainable development and resource conservation of the building industry [7][8][9].…”
Section: Introductionmentioning
confidence: 99%