2019
DOI: 10.1080/15623599.2018.1560546
|View full text |Cite
|
Sign up to set email alerts
|

Causes of delays in slum reconstruction projects in India

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1

Citation Types

0
12
0

Year Published

2019
2019
2023
2023

Publication Types

Select...
7
2

Relationship

1
8

Authors

Journals

citations
Cited by 37 publications
(12 citation statements)
references
References 31 publications
0
12
0
Order By: Relevance
“…This thesis is done mainly for the Time delay factors which has identified and ranked different factors. This result is specific to the Indian Country context however, this result will not be much different for other developing countries as well when it comes to Time delay factors [4]- [6].…”
Section: Introductionmentioning
confidence: 68%
“…This thesis is done mainly for the Time delay factors which has identified and ranked different factors. This result is specific to the Indian Country context however, this result will not be much different for other developing countries as well when it comes to Time delay factors [4]- [6].…”
Section: Introductionmentioning
confidence: 68%
“…The government does stable policies to strengthen project expenses and to monitor land cost that affect construction cost, [5]. The construction sector had a prompt impact on their projects, investment and employment contributing at least 4.7% from total projects costs, [6] and [7]. Since the last two years ago, many sectors suffered from hesitated economic situation according to Egyptian political risks.…”
Section: Overviewmentioning
confidence: 99%
“…The least significant attributes that affecting traffic management as per the RII value were helps to reduce the pollution, zero emission zones, idea to promote cycling, employers contribution towards flexible office timings, and quality of roads having a RII value of 69%, 68%, 65%, 62%, 59% respectively. Two-step cluster analysis It is an exploratory quantitative approach which is usually used in different domains of management, social science, engineering, and other areas of research It helps in the identification of structures within the data of samples used for the analysis by performing exploratory analysis [37]- [44]. It creates groups on the basis of homogeneity exists inherently on the data strings [37], [38].…”
Section: Least Significant Attributes Affecting the Traffic Managementmentioning
confidence: 99%
“…Two-step cluster analysis It is an exploratory quantitative approach which is usually used in different domains of management, social science, engineering, and other areas of research It helps in the identification of structures within the data of samples used for the analysis by performing exploratory analysis [37]- [44]. It creates groups on the basis of homogeneity exists inherently on the data strings [37], [38]. For this study SPSS 23 package used and a two-step clustering was performed on the top nine most significant attributes identified from RII [16], [45]- [47].…”
Section: Least Significant Attributes Affecting the Traffic Managementmentioning
confidence: 99%