2017
DOI: 10.1080/23311916.2017.1291117
|View full text |Cite
|
Sign up to set email alerts
|

Causes of delay in residential construction projects in Cambodia

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1
1

Citation Types

3
107
0
1

Year Published

2018
2018
2023
2023

Publication Types

Select...
4
3

Relationship

3
4

Authors

Journals

citations
Cited by 105 publications
(111 citation statements)
references
References 28 publications
3
107
0
1
Order By: Relevance
“…On this issue, the respondents were asked to rate the economic drivers of SC, and their respective RIIs are tabulated in Table 4. The SPPS-based result of Cα of 0.761 confirms the internal consistency among the economic drivers of SC [51]. The relatively lower RII values of the economic drivers compared to the environmental drivers supports the previous finding of this study, where the respondents demonstrated their tendency to have a higher level of understanding towards the environmental drivers of SC.…”
Section: Economic Driverssupporting
confidence: 77%
See 3 more Smart Citations
“…On this issue, the respondents were asked to rate the economic drivers of SC, and their respective RIIs are tabulated in Table 4. The SPPS-based result of Cα of 0.761 confirms the internal consistency among the economic drivers of SC [51]. The relatively lower RII values of the economic drivers compared to the environmental drivers supports the previous finding of this study, where the respondents demonstrated their tendency to have a higher level of understanding towards the environmental drivers of SC.…”
Section: Economic Driverssupporting
confidence: 77%
“…Table 6 shows the barriers to SC identified from the literature and their respective rankings. The results reveal that all the barriers are perceived to be significant for successful adoption of SC practices, while the Cα of 0.825 confirms the internal consistency between the items within the category [51].…”
Section: Barriers To Sustainable Constructionmentioning
confidence: 53%
See 2 more Smart Citations
“…Moreover, due to cultural context of Cambodian construction industry, there are parameters influencing service quality and client satisfaction. For instance, lack of skilled workforce (Durdyev et al 2017a), frequent project delays (Durdyev et al 2017b) and lack of quality standards are the most critical factors affecting the level of satisfaction. Therefore, authors have included the following factors (ASU2, ASU3, RLB2, RLB4, EMP2, TNG2), which thought to be significant due to cultural context of the industry in Cambodia.…”
Section: Literature Reviewmentioning
confidence: 99%