Causes of construction delay: traditional contracts

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
2

Citation Types

23
320
0
7

Year Published

2010
2010
2020
2020

Publication Types

Select...
10

Relationship

0
10

Authors

Journals

citations
Cited by 553 publications
(402 citation statements)
references
References 9 publications
23
320
0
7
Order By: Relevance
“…In contrast, construction delays or time overruns in a project can be caused by excusable delays (Othman et al, 2006), a lack of qualified and experienced personnel andlor a lack of human capital (Brown et al, 2007). Moreover, as Assaf and Al-Hejji (2006) and Odeh and Battaineh (2002) have highlighted, changes in the design, material and scope of work can be some of the main factors contributing to time overruns.…”
Section: Time Performancementioning
confidence: 99%
“…In contrast, construction delays or time overruns in a project can be caused by excusable delays (Othman et al, 2006), a lack of qualified and experienced personnel andlor a lack of human capital (Brown et al, 2007). Moreover, as Assaf and Al-Hejji (2006) and Odeh and Battaineh (2002) have highlighted, changes in the design, material and scope of work can be some of the main factors contributing to time overruns.…”
Section: Time Performancementioning
confidence: 99%
“…Salter and Torbett (2003) and Odeh and Battaineh (2002) mentioned that time variance is one of the techniques for assessing project performance in construction projects. The element of time could indicate to project managers that the project was not running as smoothly as scheduled.…”
Section: Time Performancementioning
confidence: 99%
“…At the preliminary stage of the project, it is essential that effective decisions on design specifications, project financing, contractual systems, and methods of construction are all taken at the right time [7]. Odeh and Battaineh [8] listed that one of the causes of delay is contract factors include changed orders and mistakes with discrepancies in contract documents. Actions are taken to control the causes of delay and cost overruns right away from the planning to the implementation and management stages [5].…”
Section: Introductionmentioning
confidence: 99%