Proceedings of SPE Annual Technical Conference and Exhibition 2007
DOI: 10.2523/110589-ms
|View full text |Cite
|
Sign up to set email alerts
|

Cased-Hole Cleaning: Do Annular Velocity, Annular Coverage and Contact Time Equal Mud Removal?

Abstract: fax 01-972-952-9435. AbstractMud-to-brine displacement efficiency can be difficult to quantify. Metrics to determine the success or failure of the displacement operation have traditionally been based upon the clarity of the completion brine that follows the spacers, the interface volumes of mud and completion brine, a visual determination of the cleanliness of the drillpipe pulled from the hole, and the time and materials required to filter the fluid. Despite their widespread use, however, these factors may no… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...

Citation Types

0
0
0

Year Published

2020
2020
2020
2020

Publication Types

Select...
1

Relationship

0
1

Authors

Journals

citations
Cited by 1 publication
references
References 0 publications
0
0
0
Order By: Relevance