Day 4 Thu, November 05, 2020 2020
DOI: 10.4043/30345-ms
|View full text |Cite
|
Sign up to set email alerts
|

Case Studies in the Kingdom of Saudi Arabia Demonstrate the Ability to Drill and Ream–in Casing with Multi Stage Cementing Devices and Well Bore Barriers

Abstract: This paper provides insight on planning and equipment-selection processes to successfully ream and drill in 9 5/8-in. casing through a water-sensitive shale formation, followed by a two-stage cement job to isolate lost-circulation zones. Proper placement of cement all the way to surface would be essential for providing an additional annular barrier to prevent casing-to-casing annular gas migration. Selection of the equipment is dictated by the operation to be performed (i.e., drilling new hole v… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...

Citation Types

0
0
0

Year Published

2022
2022
2022
2022

Publication Types

Select...
1

Relationship

0
1

Authors

Journals

citations
Cited by 1 publication
references
References 5 publications
0
0
0
Order By: Relevance