2022
DOI: 10.1016/j.scitotenv.2022.155910
|View full text |Cite
|
Sign up to set email alerts
|

Case of study on a sustainability building: Environmental risk assessment related with allergenicity from air quality considering meteorological and urban green infrastructure data on BIM

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1

Citation Types

0
2
0

Year Published

2022
2022
2024
2024

Publication Types

Select...
6
1

Relationship

0
7

Authors

Journals

citations
Cited by 10 publications
(2 citation statements)
references
References 65 publications
0
2
0
Order By: Relevance
“…The Aerobiological Index of Risk for Ornamental Trees (AIROT) could be used to evaluate the potential risk of pollen exposure from urban GIs on individual streets by providing a single value for the entire street in a given city. Moreover, the modified AIROT (AIROT m ), calculated using Equation (82), is designed to be applied across entire cities and provides a value for each street or avenue; also, the modified AIROT could be calculated for housing application in specific, which is denoted as AIROT mb and is calculated using Equation ( 83) [88,89].…”
Section: Pollen Exposure Riskmentioning
confidence: 99%
“…The Aerobiological Index of Risk for Ornamental Trees (AIROT) could be used to evaluate the potential risk of pollen exposure from urban GIs on individual streets by providing a single value for the entire street in a given city. Moreover, the modified AIROT (AIROT m ), calculated using Equation (82), is designed to be applied across entire cities and provides a value for each street or avenue; also, the modified AIROT could be calculated for housing application in specific, which is denoted as AIROT mb and is calculated using Equation ( 83) [88,89].…”
Section: Pollen Exposure Riskmentioning
confidence: 99%
“…The above-mentioned tasks have high labor intensity, high labor costs, are time-consuming and labor-intensive, and require extensive management. In response to these issues, this article adopts oblique photography technology for measurement, combined with the BIM model of high-speed railway design in this area, proposes a earthwork calculation process and method for the open cut section, which is used to guide the construction of earthwork engineering in the open cut section [2][3]. The schematic diagram of earthwork calculation technology route is shown in Figure 1: (1) Data acquisition The aerial camera adopts a vertical takeoff and landing fixed wing unmanned aerial vehicle flight platform, which is equipped with a 5-lens tilt camera to synchronously and automatically collect surface image data from 5 different perspectives (1 vertical direction and 4 tilt directions) according to the planned route.…”
Section: Introductionmentioning
confidence: 99%