Abstract: the Public Service Company of Northern Illinois have an interconnecting 132-kv power line over which a reliable carrier transmission channel is desirable.The carrier channel difficulties arise chiefly from the 5.8 miles of 600,000-circular-mil paper-insulated oil-filled leadcovered cable extending out from Northwest Station. This Chicago city limits (see Figure 1); the line tap at Skokie Substation; the normal overhead conductor attenuation; and the carrier terminal equipment loss at Station 6 in Waukegan. Los… Show more