1995
DOI: 10.1016/0263-7863(94)00004-v
|View full text |Cite
|
Sign up to set email alerts
|

Calculation of safe float use in risk-analysis-oriented network scheduling

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
4
1

Citation Types

0
12
0
1

Year Published

1997
1997
2020
2020

Publication Types

Select...
7
1

Relationship

0
8

Authors

Journals

citations
Cited by 29 publications
(13 citation statements)
references
References 5 publications
0
12
0
1
Order By: Relevance
“…• Cost (Paek et al, 1993;Tah, 1997) • Time (Gong and Rowings, 1995;Tah, 1997;Dawood and Bates, 1998) • Performance/quality (Pedwell et al, 1997;Tah, 1997) However, other aspects have been considered, such as safety (Tah, 1997). Each of the above tends to be interrelated.…”
Section: Risk Analysismentioning
confidence: 99%
“…• Cost (Paek et al, 1993;Tah, 1997) • Time (Gong and Rowings, 1995;Tah, 1997;Dawood and Bates, 1998) • Performance/quality (Pedwell et al, 1997;Tah, 1997) However, other aspects have been considered, such as safety (Tah, 1997). Each of the above tends to be interrelated.…”
Section: Risk Analysismentioning
confidence: 99%
“…The criticality of project tasks is often defined only from the time perspective, using stochastic approaches [6,15], fuzzy sets methods [11,39] or using the findings of a network analysis [10,19]. Gong and Rowings [19] mention that ignoring the impact of non-critical tasks, which may easily become critical, is the most frequent criticism of project duration analysis methods.…”
Section: Introductionmentioning
confidence: 99%
“…Gong and Rowings [19] mention that ignoring the impact of non-critical tasks, which may easily become critical, is the most frequent criticism of project duration analysis methods. Another point of view on tasks criticalness is given by the structure of relations in the project.…”
Section: Introductionmentioning
confidence: 99%
“…Many studies in risk management focused on management process ( Simon et al 1996;Saito 1997;Sawada 2000) and risk analysis (Chapman 1998;Gong 1995;Ren 1994) in the past decade.…”
Section: Introductionmentioning
confidence: 99%
“…Ren (1994) assessed the risk relationship between risk lifecycle and separate project risks to analyze the financial risks. Gong (1995) enhanced the PERT/PCM project scheduling technique by applying time-disturbance analysis to lower the prediction uncertainty caused by disregarding the effect of noncritical activities on project-duration estimation. Other studies have attempted to develop more powerful and precise analysis methods to support user decisions (Ren 1994;Gong 1995).…”
Section: Introductionmentioning
confidence: 99%