2022
DOI: 10.58227/jge.v1i1.4
|View full text |Cite
|
Sign up to set email alerts
|

Calculation of PIT 4 Coal Reserves with Cross-Cross Method

Abstract: Calculating coal reserves using the vertical section method can describe the condition of deposits and overburden in each section. This study aimed to determine the direction of coal distribution, the volume of overburden, and the volume of coal using the cross-section method and to obtain the stripping ratio (SR). In this research activity, data is needed in the form of documentation on pit 4, cross-section, drill logs, and coordinates of drill points. After all the data has been collected, it is continued by… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
4
1

Citation Types

0
4
0

Year Published

2022
2022
2023
2023

Publication Types

Select...
6

Relationship

0
6

Authors

Journals

citations
Cited by 6 publications
(6 citation statements)
references
References 9 publications
0
4
0
Order By: Relevance
“…Metode penelitian ini dilakukan dengan pengamatan langsung dilapangan. Adapun data-data yang diperoleh adalah catatan waktu dari setiap aktivitas-aktivitas selama satu hari kerja pada pemboran eksplorasi berupa aktivitas memasukkan inner tube dalam core barrel, putaran kosong, pengeboran, mengeluarkan inner tube dalam core barrel, memasukkan inner tube dalam core barrel, menyiapkan inner tube, menambah pipa, permasalahan inner tube tidak landing dan inner tube tidak dapat naik, merapikan perlengkapan pemboran, mengeluarkan pipa, memindahkan alat bor dan perlengkapannya, persiapan pemboran, transportasi, aksesibilitas, persiapan kerja kru, safety talk/ meeting, pengecekan alat, pengisian bahan bakar, menunggu dozer, persiapan pulang kru, menunggu supervisor/ geologist, menunggu kru, masalah cuaca, istirahat, menunggu pulang, perbaikan, serta masalah air (Husain et al, 2022;Shabiruddin et al, 2022).…”
Section: Metodeunclassified
“…Metode penelitian ini dilakukan dengan pengamatan langsung dilapangan. Adapun data-data yang diperoleh adalah catatan waktu dari setiap aktivitas-aktivitas selama satu hari kerja pada pemboran eksplorasi berupa aktivitas memasukkan inner tube dalam core barrel, putaran kosong, pengeboran, mengeluarkan inner tube dalam core barrel, memasukkan inner tube dalam core barrel, menyiapkan inner tube, menambah pipa, permasalahan inner tube tidak landing dan inner tube tidak dapat naik, merapikan perlengkapan pemboran, mengeluarkan pipa, memindahkan alat bor dan perlengkapannya, persiapan pemboran, transportasi, aksesibilitas, persiapan kerja kru, safety talk/ meeting, pengecekan alat, pengisian bahan bakar, menunggu dozer, persiapan pulang kru, menunggu supervisor/ geologist, menunggu kru, masalah cuaca, istirahat, menunggu pulang, perbaikan, serta masalah air (Husain et al, 2022;Shabiruddin et al, 2022).…”
Section: Metodeunclassified
“…In some places, groundwater availability is quite good, but it takes work to obtain in others. This, of course, cannot be separated from the hydrogeological conditions of the Makassar Region (Jafar et al, 2022;Shabiruddin et al, 2022).…”
Section: Introductionmentioning
confidence: 98%
“…The cross-section method consists of the guidelines for the rule of gradual changes and the guidelines for the rule of the nearest point. Calculation of the area of each cross-section can be done manually using a planimetry tool or graphically by calculating blocks in millimeter blocks [7].…”
Section: Introductionmentioning
confidence: 99%