Abstract:When the buried high pour point oil pipeline is running, it is inevitable to avoid pipeline failures and the pipeline should be shutdown. After shutdown oil temperature dropped and viscosity increased, oil gelling happens, it will cause the accident "condensing tube". For high pour-point oil pipeline can start after shutdown, it should ensure the safety shutdown time of the pipeline and corresponding in the restart pressure. So it is necessary to guide the production practice and pipeline safe operation.
scite is a Brooklyn-based organization that helps researchers better discover and understand research articles through Smart Citations–citations that display the context of the citation and describe whether the article provides supporting or contrasting evidence. scite is used by students and researchers from around the world and is funded in part by the National Science Foundation and the National Institute on Drug Abuse of the National Institutes of Health.