2018
DOI: 10.1007/s41365-018-0420-2
|View full text |Cite
|
Sign up to set email alerts
|

Bunch-by-bunch beam size measurement during injection at Shanghai Synchrotron Radiation Facility

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
3
1
1

Citation Types

0
5
0

Year Published

2019
2019
2024
2024

Publication Types

Select...
7
1

Relationship

1
7

Authors

Journals

citations
Cited by 15 publications
(6 citation statements)
references
References 12 publications
0
5
0
Order By: Relevance
“…While for the Oscilloscope-based approach, its system can be built quickly, and the BbB profile can be extracted by specific algorithms. However, the past extraction algorithm for BbB profile can hardly work timely due to the time cost of the Gaussian fitting process [7]. To accelerate the extraction process, one in-situ extraction algorithm for monitoring BbB profile in the storage ring was developed.…”
Section: Figure 1 the Layout Of Typical Synchrotron Radiation Light S...mentioning
confidence: 99%
“…While for the Oscilloscope-based approach, its system can be built quickly, and the BbB profile can be extracted by specific algorithms. However, the past extraction algorithm for BbB profile can hardly work timely due to the time cost of the Gaussian fitting process [7]. To accelerate the extraction process, one in-situ extraction algorithm for monitoring BbB profile in the storage ring was developed.…”
Section: Figure 1 the Layout Of Typical Synchrotron Radiation Light S...mentioning
confidence: 99%
“…When the pre-kicker is triggered, the expected beam centroid motion is not measured, and the machine protection system can be notified to prevent extraction. In addition, recent developments in bunch-by-bunch beam size measurement systems [16] could provide more direct verification of the influence of the pre-kicker system on the bunch size. This aspect of the beam instrumentation and machine protection systems requires a more refined study.…”
Section: Working Principle Of a Pre-kicker Systemmentioning
confidence: 99%
“…By measuring the transverse size of the bunched beam, we can obtain the transverse damping time, the transverse quadrupole oscillation frequency and other machine parameters. Furthermore, by analyzing the change of the transverse beam size during injection, the injection efficiency can be optimized and simultaneously the mechanism of the transverse beam instability under high current intensity also can be explored [2] . Therefore, in order to further improve the performance and operation stability of the machine, it is necessary to develop a bunch-by-bunch transverse beam size measurement system for the investigation of beam instability, analysis of beam dynamics, and optimization of beam injection process.…”
Section: Introductionmentioning
confidence: 99%