2015
DOI: 10.5130/ajceb.v12i4.3032
|View full text |Cite
|
Sign up to set email alerts
|

Building information modelling (BIM): now and beyond

Abstract: Building Information Modeling (BIM), also called n-D Modeling or Virtual Prototyping Technology, is a revolutionary development that is quickly reshaping the ArchitectureEngineering-Construction (AEC) industry. BIM is both a technology and a process. The technology component of BIM helps project stakeholders to visualize what is to be built in a simulated environment to identify any potential design, construction or operational issues. The process component enables close collaboration and encourages integratio… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1
1

Citation Types

9
360
0
21

Year Published

2015
2015
2021
2021

Publication Types

Select...
4
4
2

Relationship

0
10

Authors

Journals

citations
Cited by 503 publications
(399 citation statements)
references
References 5 publications
9
360
0
21
Order By: Relevance
“…BIM is applied in project planning, design, pre-construction, construction and post-construction (operations and maintenance) stages. In planning stage, the project team can utilize BIM in analyzing space and understanding the complexity of land regulations and space standards, hence saving time and providing the team more time to create more value-added activities (Azhar, Khalfan, & Maqsood, 2012). In this phase, advanced 3D laser scanning equipment is used to scan the site to determine the position of existing utilities accurately and then integrate them in the BIM model.…”
Section: Concept and The Use Of Bimmentioning
confidence: 99%
“…BIM is applied in project planning, design, pre-construction, construction and post-construction (operations and maintenance) stages. In planning stage, the project team can utilize BIM in analyzing space and understanding the complexity of land regulations and space standards, hence saving time and providing the team more time to create more value-added activities (Azhar, Khalfan, & Maqsood, 2012). In this phase, advanced 3D laser scanning equipment is used to scan the site to determine the position of existing utilities accurately and then integrate them in the BIM model.…”
Section: Concept and The Use Of Bimmentioning
confidence: 99%
“…This includes confidential information and trade secrets such as construction techniques and sequencing. Addressing IP in a collaborative environment increases the complexity of IP allocation (Azhar, Khalfan and Masqsood, 2012;Kog, 2010;Larson and Golden, 2007;Olsen and Taylor, 2010;Porwal and Hewage, 2013).…”
Section: Intellectual Propertymentioning
confidence: 99%
“…The most common challenges to adopting BIM technology within construction firms identified by some researchers such as [4,[10][11][12][13][14][15][16][17][18][19][20][21]. One of the biggest problems that counter of construction firms, is the difficulty in correct visualize to the construction planning in workspaces through creating complex schedules and difficult in the interpretation [15].…”
Section: Challenges Of 4d/bim Technologymentioning
confidence: 99%