2017
DOI: 10.1016/j.autcon.2017.08.016
|View full text |Cite
|
Sign up to set email alerts
|

Building Information Modeling enabled Cascading Formwork Management Tool

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1
1

Citation Types

0
27
0
1

Year Published

2017
2017
2021
2021

Publication Types

Select...
7
1

Relationship

0
8

Authors

Journals

citations
Cited by 36 publications
(28 citation statements)
references
References 13 publications
0
27
0
1
Order By: Relevance
“…Real-time data collected in BIM can support project stakeholders' decision-making by controlling and interpreting data pattern changes and trends [44,[47][48][49]. Current research has focused on using BIM for concrete formwork planning and design rather than monitoring and calculating the maturity of concrete during the formwork process [44,[47][48][49][50]. Therefore, the present study expanded the interoperability of BIM for real-time monitoring of the maturity of concrete by using sensor data and calculations conducted through the API interface, in addition to conveying the possible formwork opening time that does not risk damage to the concrete's structural elements.…”
Section: Methodsmentioning
confidence: 99%
See 2 more Smart Citations
“…Real-time data collected in BIM can support project stakeholders' decision-making by controlling and interpreting data pattern changes and trends [44,[47][48][49]. Current research has focused on using BIM for concrete formwork planning and design rather than monitoring and calculating the maturity of concrete during the formwork process [44,[47][48][49][50]. Therefore, the present study expanded the interoperability of BIM for real-time monitoring of the maturity of concrete by using sensor data and calculations conducted through the API interface, in addition to conveying the possible formwork opening time that does not risk damage to the concrete's structural elements.…”
Section: Methodsmentioning
confidence: 99%
“…Kannan and Santhi [46] developed a BIM-based automated concrete formwork layout and simulation system that could predict construction schedules based on a BIM formwork simulation. Another study in this domain developed a BIM-based concrete formwork management system for improving the efficiency of formwork use, such as by optimizing reuse and maximizing return-on-investment [47]. The current state of knowledge has contributed significantly to developing BIM-based management systems, especially in terms of concrete formwork design and planning during the pre-construction step [44,46,47].…”
Section: Concrete Formwork Applications In Bimmentioning
confidence: 99%
See 1 more Smart Citation
“…Software suppliers have flooded the market with numerous BIM software packages dealing with different types of construction information throughout those years. This has led to end-users facing significant challenges as to which software systems to use, in which type of construction domains/activities, and how to effectively use the chosen software packages(s) [9,10]. Although the current plug-ins allow energy simulation to be integrated from the beginning of the design phase through the BIM model [11], the software package used is always located among the energy modelling systems commonly used.…”
Section: Introductionmentioning
confidence: 99%
“…The benefits of deploying BIM in construction planning include early detection and resolution of clashes and constructability issues by providing visualisation (Chambers, 2010;Zhang and Hu, 2011). Also, the research works addressed the issues relevant to temporary construction and importance of its planning (Chi, Hampson and Biggs, 2012;Mansuri et al, 2017). Furthermore, information for quantity estimates can be prepared by extracting detailed quantity information from the exact 3D model with consistency (Kim et al, 2013), also easing the process of resolving conflicts and site logistics using 4D simulation (Hartmann, Gao and Fischer, 2008; American Institute of Architects, 2009).…”
Section: Use Of Bim In Construction Phase Of Projectsmentioning
confidence: 99%