2014
DOI: 10.1007/978-3-662-45937-9_1
|View full text |Cite
|
Sign up to set email alerts
|

Building Information Modeling (BIM) for Facilities Management – Literature Review and Future Needs

Abstract: Facilities management (FM) is a discipline comprising of various operations, activities and maintenance services to support the main functions of an inuse building or facility. It demands comprehensive sets of information about the facility. While various FM information systems are currently being used to manage such information, the multifarious graphical and non-graphical information stored in Building Information Models (BIM) from the pre-use phase have not been sufficiently integrated in existing FM system… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1
1

Citation Types

0
36
0
2

Year Published

2015
2015
2021
2021

Publication Types

Select...
6
2

Relationship

0
8

Authors

Journals

citations
Cited by 55 publications
(49 citation statements)
references
References 20 publications
0
36
0
2
Order By: Relevance
“…In essence, BIM utilisation is almost entirely restricted to the design and construction phases of a building's development vis-a-vis the O&M phase (Volk et al, 2014, Wetzel and Thabet, 2015, Shalabi and Turkan, 2016, Pishdad-Bozorgi, 2017. To address this problem, attempts to expand research within the field of BIM4FM have only recently intensified (Yalcinkaya and Singh, 2014, Ilter and Ergen, 2015, Kassem et al, 2015. Amongst various research themes investigated, the issue of identifying what information and data to be prepared and handed over is a conspicuous variable affecting BIM4FM (Ilter and Ergen, 2015).…”
Section: Role Of Data and Informationmentioning
confidence: 99%
“…In essence, BIM utilisation is almost entirely restricted to the design and construction phases of a building's development vis-a-vis the O&M phase (Volk et al, 2014, Wetzel and Thabet, 2015, Shalabi and Turkan, 2016, Pishdad-Bozorgi, 2017. To address this problem, attempts to expand research within the field of BIM4FM have only recently intensified (Yalcinkaya and Singh, 2014, Ilter and Ergen, 2015, Kassem et al, 2015. Amongst various research themes investigated, the issue of identifying what information and data to be prepared and handed over is a conspicuous variable affecting BIM4FM (Ilter and Ergen, 2015).…”
Section: Role Of Data and Informationmentioning
confidence: 99%
“…A large literature exists on the deployment of PLM and/or BIM to support the BOL (Beginning of Life) or MOL (Middle of Life) phases of NPPs [18][19][20]. One can cite for instance [18] that address the digitized concept of the nuclear industries by deploying PLM and BIM merely focusing on the UK's nuclear sector.…”
Section: Plm-bim In Nuclear Facilities and Perspectivesmentioning
confidence: 99%
“…Die Daten werden im Rahmen der Ausführung mit Detaildaten ergänzt. Mithilfe von sogenannten Data Drops werden zu definierten Meilensteinen Gebäudedaten übergeben .…”
Section: Vorstellung Und Analyse Möglicher Austauschformateunclassified