Building information modeling (BIM) adoption challenges for contractor’s organisations in Malaysia

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1
1

Citation Types

0
8
0

Year Published

2019
2019
2023
2023

Publication Types

Select...
4
2

Relationship

0
6

Authors

Journals

citations
Cited by 7 publications
(8 citation statements)
references
References 5 publications
0
8
0
Order By: Relevance
“…R1 [ 17 ], R2 [ 18 ], R3 [ 19 ], R4 [ 10 ], R5 [ 20 ], R6 [ 21 ], R7 [ 22 ], R8 [ 23 ], R9 [ 24 ], R10 [ 25 ], R11 [ 26 ], R12 [ 13 ], R13 [ 27 ], R14 [ 28 ], R15 [ 29 ], R16 [ 30 ], R17 [ 31 ], R18 [ 32 ], R19 [ 26 ], R20 [ 33 ], R21 [ 34 ], R22 [ 35 ], R23 [ 36 ], R24 [ 37 ], R25 [ 38 ], R26 [ 39 ], R27 [ 40 ], R28 [ 41 ], R29 [ 42 ], R30 [ 43 ], R31 [ 44 ], R32 [ 45 ], R33 [ 46 ], R34 [ 47 ], R35 [ 48 ], R36 [ 49 ], R37 [ 50 ], R38 [ 51 ], R39 [ 52 ], R40 [ 53 ], R41 [ 54 ], R42 [ 55 ], R43 [ 56 ], R44 [ 57 ], 45 [ 58 ], 46 [ 59 ], R47 [ 60 ], R48 [ 61 ], R49 [ 62 ], R50 [ 63 ], R51 [ 64 ], R52 [ 65 ], R53 [ 66 ], R54 [ 67 ], R55 [ 68 ], R56 [ 69 ], R57 [ 70 ], R58 [ 71 ], R59 [ 72 ], R60 [ 73 ], R61 [ 74 ], R62 [ 75 ], R63 [ 76 ], R64 [ 77 ], R65 [ 78 ], R66 [ 79 ], R67 [ ...…”
Section: Resultsmentioning
confidence: 99%
“…R1 [ 17 ], R2 [ 18 ], R3 [ 19 ], R4 [ 10 ], R5 [ 20 ], R6 [ 21 ], R7 [ 22 ], R8 [ 23 ], R9 [ 24 ], R10 [ 25 ], R11 [ 26 ], R12 [ 13 ], R13 [ 27 ], R14 [ 28 ], R15 [ 29 ], R16 [ 30 ], R17 [ 31 ], R18 [ 32 ], R19 [ 26 ], R20 [ 33 ], R21 [ 34 ], R22 [ 35 ], R23 [ 36 ], R24 [ 37 ], R25 [ 38 ], R26 [ 39 ], R27 [ 40 ], R28 [ 41 ], R29 [ 42 ], R30 [ 43 ], R31 [ 44 ], R32 [ 45 ], R33 [ 46 ], R34 [ 47 ], R35 [ 48 ], R36 [ 49 ], R37 [ 50 ], R38 [ 51 ], R39 [ 52 ], R40 [ 53 ], R41 [ 54 ], R42 [ 55 ], R43 [ 56 ], R44 [ 57 ], 45 [ 58 ], 46 [ 59 ], R47 [ 60 ], R48 [ 61 ], R49 [ 62 ], R50 [ 63 ], R51 [ 64 ], R52 [ 65 ], R53 [ 66 ], R54 [ 67 ], R55 [ 68 ], R56 [ 69 ], R57 [ 70 ], R58 [ 71 ], R59 [ 72 ], R60 [ 73 ], R61 [ 74 ], R62 [ 75 ], R63 [ 76 ], R64 [ 77 ], R65 [ 78 ], R66 [ 79 ], R67 [ ...…”
Section: Resultsmentioning
confidence: 99%
“…Resistance to change by staff Some employees believe that BIM is too complicated, and thus it is faster to complete project projects with non-BIM tools. [4,7,11] Resistance to change new technology Some suspect that BIM is just an unassembled technology with limited features. [2,7,12,13] Clients do not request/enforce BIM Without significant knowledge and awareness about BIM, Clients may not wish to implement BIM in their projects.…”
Section: Bim Sub-barriers To the Bim Implementationmentioning
confidence: 99%
“…This slow adaptation of BIM in Malaysia somehow affects its evolution toward its step as a developed nation. Although there are benefits of using BIM throughout the project life-cycle, such as increased productivity and efficient design, assessment time and cost associated with design change, and elimination of clashes in design, most construction players in Malaysia neglect BIM usage awareness in the construction phase [4]. Moreover, when it comes to BIM in the Malaysian construction phase, only 4.2% of players were applying, and that is ten times less than the number of BIM applications in the design phase [5].…”
Section: Introductionmentioning
confidence: 99%
“…Advances in Civil Engineering promises to improve the overall performance of construction projects in the AEC industry [10,15]. e BIM process is identified as the force driving construction industries worldwide, and differences in national construction policy schemes in several nations correspondingly lead to variations in the development of BIM implementation strategies [30,31]. BIM implementation is an emerging topic currently being investigated in various markets around the globe [32].…”
Section: Literature Reviewmentioning
confidence: 99%