2021
DOI: 10.1155/2021/6684031
|View full text |Cite
|
Sign up to set email alerts
|

Building Information Modeling Application Maturity Model (BIM-AMM) from the Viewpoint of Construction Project

Abstract: BIM maturity models have become a significant method used to show the development stage of building information modeling (BIM) and to assist in measuring BIM capability. However, most of the existing maturity models focus on the evaluation technology, but the effect of BIM is not only related to technology, and most of them are mostly used for a comprehensive evaluation of BIM capability after the event. In this paper, for the purpose of comprehensive preevaluation of BIM application maturity of the project, c… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1

Citation Types

0
3
0

Year Published

2022
2022
2024
2024

Publication Types

Select...
5
1

Relationship

0
6

Authors

Journals

citations
Cited by 7 publications
(3 citation statements)
references
References 27 publications
(25 reference statements)
0
3
0
Order By: Relevance
“…Lu constructs BIM maturity models to measure the degree of development and level of competence in the application of BIM technology at the project, organization, and industry levels [30]. Sun constructs the BIM application maturity model (BIM-AMM) from the perspectives of technology, social environment, and project participants [31]. Considering the wide range of information technology utilized in assembly-building projects, including but not limited to BIM [32], assessing informatization maturity cannot be considered comprehensive by exclusively considering BIM.…”
Section: Capability Maturity Modelmentioning
confidence: 99%
“…Lu constructs BIM maturity models to measure the degree of development and level of competence in the application of BIM technology at the project, organization, and industry levels [30]. Sun constructs the BIM application maturity model (BIM-AMM) from the perspectives of technology, social environment, and project participants [31]. Considering the wide range of information technology utilized in assembly-building projects, including but not limited to BIM [32], assessing informatization maturity cannot be considered comprehensive by exclusively considering BIM.…”
Section: Capability Maturity Modelmentioning
confidence: 99%
“…At the same time, the system allows for tariff signals relating to the price of electricity supply to be transmitted to customers in a simplified form (differentiation between high and low price bands). As a result, customers in the Czech Republic have, for many years, enjoyed most of the benefits [1,2] that the EU hopes to obtain from the introduction of smart metering systems (also referred to as AMM). Distribution companies can thus also influence (optimize) the course of the daily load in distribution networks within the limits set by tariff schemes approved by the regulatory authority.…”
Section: Introductionmentioning
confidence: 99%
“…Other models to assess maturity of the CI are for safety, health and environmental management (Asah-Kissiedu et al , 2021), to improve productivity at the managerial level (Pornthepkasemsant and Charoenpornpattana, 2019), to assess risk areas requiring improvements in construction (Karunarathne and Kim, 2021), to operate a claims management office (Parchamijalal et al , 2021), to implement disability management (Quaigrain and Issa, 2021), for collaborative scheduling to enhance collaboration in the CI (Scala et al , 2022), to evaluate BIM capability (Sun et al , 2021), to manage work-related injuries (Quaigrain and Issa, 2021), to implement continuous improvement system in construction companies (Omotayo et al , 2020) and others.…”
Section: Introductionmentioning
confidence: 99%