2016
DOI: 10.4324/9781315695129
|View full text |Cite
|
Sign up to set email alerts
|

Building Cost Planning for the Design Team

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
3
1
1

Citation Types

0
23
0

Year Published

2016
2016
2021
2021

Publication Types

Select...
6

Relationship

0
6

Authors

Journals

citations
Cited by 25 publications
(23 citation statements)
references
References 0 publications
0
23
0
Order By: Relevance
“…Expenses on these actions have to be shifted to the owner of a design or the organization, which exercises control and operation. We compared the methods that were suggested in this paper with methods from well-known international agencies -«RS Means» [16] and «Spon's» [17], who publish the Engineering Price Book (or Cost Handbook) and obtained the correct correlation.…”
Section: Resultsmentioning
confidence: 99%
“…Expenses on these actions have to be shifted to the owner of a design or the organization, which exercises control and operation. We compared the methods that were suggested in this paper with methods from well-known international agencies -«RS Means» [16] and «Spon's» [17], who publish the Engineering Price Book (or Cost Handbook) and obtained the correct correlation.…”
Section: Resultsmentioning
confidence: 99%
“…Here, twenty five out of the thirty constructions were randomly selected to test the method and the remaining was set aside to finally validate its accuracy. The first twenty five were divided into five groups (A, B, C, D and E) considering their similarities under following criteria: a) Usage: Residentialor Commercial; b) Size (Gross Building Area): under 10,000 m 2 , around 15,000 m 2 , around 20,000 m 2 and over; c) Class of Specification: A (superior), B (medium), C (basic). In Brazil, real estate market buildings are usually very similar in respect to its adopted construction technology and process adopted.…”
Section: Methodsmentioning
confidence: 99%
“…Considering the urge with which most of real estate investment decisions need to be taken, it is expected that the construction costs estimation can be quickly provided only on the basis of either architectural study or from legal projects even before construction has been fully studied, designed, detailed and specified. Smith (2007) [2] states that:…”
Section: Introductionmentioning
confidence: 99%
“…Obviously, different types of buildings will have different CSE. The one and only comprehensive theory on CSE and their effects can be found in Smith and Jaggar [4]. They provided a good explanation on CSE and their effects for high-density residential multi-unit projects.…”
Section: Introductionmentioning
confidence: 99%
“…This knowledge can be learned from courses during the study in the university or from working experiences. In the HRCP, the CSE are: Frame (Columns, Upper Floors), Finishes (Wall, Ceiling and Floor), Envelope (External Walls and Windows), Services, Internal Subdivision (Internal Walls, Screens and Doors), Preliminaries, and Fittings whereas the non CSE are: External Doors, Stairs, Roof, External Works, and Substructure [4]. Studies on CSE are vital, new, and so far, only received little attention both in Malaysia and overseas.…”
Section: Introductionmentioning
confidence: 99%