Building contingency planning for closed‐loop supply chains with product recovery

Abstract: Contingency planning is the first stage in developing a formal set of production planning and control activities for the reuse of products obtained via return flows in a closed‐loop supply chain. The paper takes a contingency approach to explore the factors that impact production planning and control for closed‐loop supply chains that incorporate product recovery. A series of three cases are presented, and a framework developed that shows the common activities required for all remanufacturing operations. To bu… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1

Citation Types

1
169
0
10

Year Published

2008
2008
2017
2017

Publication Types

Select...
6
3

Relationship

0
9

Authors

Journals

citations
Cited by 350 publications
(184 citation statements)
references
References 18 publications
1
169
0
10
Order By: Relevance
“…The Cronbach's Alpha coefficient's of 'Micro-entrepreneurs' bookkeeping execution practices' is 0.893 greater than 0.707 which; Nunnaly [69], Peterson [70], Gliem [71] explains that the variable items on the five-point Likert-scale used are reliable. [72][73][74][75][76][77][78][79][80][81][82][83][84][85].…”
Section: Presentation Of Results and Discussionmentioning
confidence: 99%
“…The Cronbach's Alpha coefficient's of 'Micro-entrepreneurs' bookkeeping execution practices' is 0.893 greater than 0.707 which; Nunnaly [69], Peterson [70], Gliem [71] explains that the variable items on the five-point Likert-scale used are reliable. [72][73][74][75][76][77][78][79][80][81][82][83][84][85].…”
Section: Presentation Of Results and Discussionmentioning
confidence: 99%
“…Many operations involved in remanufacturing have tried to use traditional planning approaches but these have been left wanting as the planning requirements of a remanufacturing operation are unique (Guide, Jayaraman and Linton, 2003). As a result of this, organisations attempting to use a one size fits all approach to planning and scheduling of work in a remanufacturing context were highly likely to fail.…”
Section: Flowmentioning
confidence: 99%
“…When adopting a contingency approach to a remanufacturing operation it is essential that the planners build the operation to suit the rate of arrival of returned product and the type of remanufacturing operation that is to take place, i.e. remanufacture to order, reassemble to order or remanufacture to stock (Guide, Jayaraman and Linton, 2003).…”
Section: Flowmentioning
confidence: 99%
“…The automotive sector particularly has a strong and long history of remanufacturing (Seitz, 2007;Golinska, & Kawa, 2011) where the alternator has the highest remanufacturing rate (Schau, Traverso, & Finkbeiner, 2012). Remanufacturing is also gaining scientific significance in a variety of industries that include single use-devices for hospitals, such as wheelchairs and hearing aids (Srivastava, 2004) cellular phones (Guide Jr, Jayaraman, & Linton, 2003b) and truck tyres (Lebreton & Tuma, 2006). The diverse nature of remanufactured products together with different degrees of remanufacturing efforts creates a variety of applications (Zikopoulos, 2012).…”
Section: Introductionmentioning
confidence: 99%