Borehole Investigation of the Effectiveness of Grout Injection Technology on Coal Mine Subsidence Control

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
3
2

Citation Types

0
38
0

Year Published

2016
2016
2022
2022

Publication Types

Select...
7

Relationship

2
5

Authors

Journals

citations
Cited by 67 publications
(44 citation statements)
references
References 18 publications
0
38
0
Order By: Relevance
“…In this regard, Xuan et al (2015) found that the injected fill gathered mainly in a main injection section (with a height of 4.8-18.4 m) of the overburden, which included more than 90% of the total fill; vertically, the main injection section was found to be located between the bottom of the injection borehole and the strong rock layer (i.e., the key stratum, defined by Qian et al (1996)) immediately above. Considering the characteristics of the main injection section, it is reasonable to assume that the fill occupies a single horizon-the main injection horizon.…”
Section: Theoretical Backgroundmentioning
confidence: 96%
See 3 more Smart Citations
“…In this regard, Xuan et al (2015) found that the injected fill gathered mainly in a main injection section (with a height of 4.8-18.4 m) of the overburden, which included more than 90% of the total fill; vertically, the main injection section was found to be located between the bottom of the injection borehole and the strong rock layer (i.e., the key stratum, defined by Qian et al (1996)) immediately above. Considering the characteristics of the main injection section, it is reasonable to assume that the fill occupies a single horizon-the main injection horizon.…”
Section: Theoretical Backgroundmentioning
confidence: 96%
“…Although the fly ash grout that contains water spreads in the overburden voids during injection, the water drains gradually, leaving the grout as compacted fill, which may sometimes be wet (Ilgner, 2000;Ward et al, 2006). This was demonstrated by a field borehole investigation conducted by Xuan et al (2015). In view of this, the scope of this study was limited to the distribution of the final compacted fill rather than that of the initial flowing grout, and the grout take refers to the actual dry fly ash injected.…”
Section: Theoretical Backgroundmentioning
confidence: 99%
See 2 more Smart Citations
“…2 Because of the high injection pressure and large injection volume (generally up to 40% of the mined-out space), the main injection horizon (i.e., the horizon containing 90% of the total fill) will occur between the bottom of the injection borehole and the overlying key stratum. 3 However, if the target horizon of the injection is the gob area, the grouting is generally implemented by drilling boreholes into the mined-out areas following the extraction. 17 It is clear from the above process that to achieve borehole sharing, the timing and the targeted vertical horizons for the drainage and injection must be coordinated.…”
Section: Theoretical Backgroundmentioning
confidence: 99%