2008 IEEE Power and Energy Society General Meeting - Conversion and Delivery of Electrical Energy in the 21st Century 2008
DOI: 10.1109/pes.2008.4596565
|View full text |Cite
|
Sign up to set email alerts
|

Black start studies for system restoration

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
2
1

Citation Types

0
34
0
2

Year Published

2014
2014
2020
2020

Publication Types

Select...
4
3

Relationship

0
7

Authors

Journals

citations
Cited by 72 publications
(38 citation statements)
references
References 18 publications
0
34
0
2
Order By: Relevance
“…During island-mode operation, this situation can lead to a black out [100]. The stability of the system has then been compromised, and all DG units are disconnected from the MG [101][102][103].…”
Section: Black-start Operationmentioning
confidence: 99%
See 1 more Smart Citation
“…During island-mode operation, this situation can lead to a black out [100]. The stability of the system has then been compromised, and all DG units are disconnected from the MG [101][102][103].…”
Section: Black-start Operationmentioning
confidence: 99%
“…The process of restoring the system is called a black start [101]. Power management, balancing, and voltage control are the responsibilities of the black-start restoration service, which is embedded in the MGCC.…”
Section: Black-start Operationmentioning
confidence: 99%
“…Equation (5) corresponds to the blue area and Equation (6) to the green one in Figure 2d. If the parameters of the generator and transmission lines satisfy one of Equations (5) and (6), any kind of self-excitations will not occur during the process of charging the transmission line from the generator.…”
Section: Voltage Of Linementioning
confidence: 99%
“…Research and practice show that the overvoltage problem becomes more serious under the conditions of high system voltage, long-distance transmission lines, and large charging transformer capacity [6]. Because of the typical high voltage levels and long transmission lines found in modern bulk power systems, self-excitation and power frequency/operating overvoltage are more likely to occur during the process of power system restoration, leading to the failure of the black start [7].…”
Section: Introductionmentioning
confidence: 99%
See 1 more Smart Citation