BIM tool development enhancing collaborative scheduling for pre-construction

Abstract: Construction projects often suffer from backlashes in relation to poor plans and schedules. Especially pre-construction planning has been challenging due to a high complexity, an extensive amount of information, and a lack of site managers time to make the schedule. To solve these issues for pre-construction planning; new planning processes, methods and tools have been developed over the last decade. However, due to a disregard of the current planning processes these tools have been difficult to adopt in pract… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1
1

Citation Types

0
8
0
4

Year Published

2021
2021
2024
2024

Publication Types

Select...
7

Relationship

0
7

Authors

Journals

citations
Cited by 19 publications
(12 citation statements)
references
References 32 publications
(54 reference statements)
0
8
0
4
Order By: Relevance
“…Cooperative scheduling which includes subcontractor contribution is a rarely adopted method because collaborative interfaces and ICT tools are not user friendly for new or inexperienced users, so Tallgren et al [64] developed a web-based VPP application for collaborative BIM 4D scheduling which was used and evaluated on a real project case. Users stressed the improved legibility of the schedule as well as a better overview of the tasks and agreed that VPP really supports cooperative scheduling [64]. Another approach on a similar issue was the development of a web and database-supported visualization platform that enables real-time information sharing of daily 4D BIM.…”
Section: Upgrading the Bim Collaborative Capabilities With Web And Other Ict Technologiesmentioning
confidence: 99%
“…Cooperative scheduling which includes subcontractor contribution is a rarely adopted method because collaborative interfaces and ICT tools are not user friendly for new or inexperienced users, so Tallgren et al [64] developed a web-based VPP application for collaborative BIM 4D scheduling which was used and evaluated on a real project case. Users stressed the improved legibility of the schedule as well as a better overview of the tasks and agreed that VPP really supports cooperative scheduling [64]. Another approach on a similar issue was the development of a web and database-supported visualization platform that enables real-time information sharing of daily 4D BIM.…”
Section: Upgrading the Bim Collaborative Capabilities With Web And Other Ict Technologiesmentioning
confidence: 99%
“…In the collaborative innovation projects, member enterprises of the construction supply chain must carry out a substantial amount of information interaction and transmission, so efficient and accurate information transmission is an important guarantee for the achievement of a high level of innovation performance (Aibinu et al , 2020). BIM application can visually integrate and transmit a large amount of engineering information and can realize efficient and accurate information transmission and sharing with the assistance of network technology (Georgiadou, 2019; Tallgren et al , 2020). However, explicit knowledge in the construction supply chain can be transmitted through such information channels, while tacit knowledge is invisible and difficult to be transmitted directly through such channels.…”
Section: Discussionmentioning
confidence: 99%
“…A good information channel is an important condition for the achievement of a higher level of innovation performance. In the past, although enterprises in the construction supply chain had good intentions of collaborative innovation, the closure of information channels led to slow and distorted information transmission in the interaction process, which seriously affected the effect of collaborative innovation (Tallgren et al , 2020). BIM application can break the information barriers between enterprises in the construction supply chain, overcome time and space barriers in information interaction and quickly carry out information transmission (Cao et al , 2016; Chen, 2015).…”
Section: Hypotheses Developmentmentioning
confidence: 99%
“…Based on these data, many efforts have been made to manage the construction schedule and associated risks of infrastructures. Building information modelling (BIM) has been adopted as a powerful management tool for schedule planning (Liu et al, 2015;Tallgren et al, 2020), control (Moon et al, 2015) and risk management (Sami Ur Rehman et al, 2020). Based on that, extended reality (XR) has been further proposed to assist schedule control (Alizadehsalehi et al, 2020;Fu and Liu, 2018).…”
Section: Introductionmentioning
confidence: 99%