2014
DOI: 10.1155/2014/589016
|View full text |Cite
|
Sign up to set email alerts
|

BIM Based Virtual Environment for Fire Emergency Evacuation

Abstract: Recent building emergency management research has highlighted the need for the effective utilization of dynamically changing building information. BIM (building information modelling) can play a significant role in this process due to its comprehensive and standardized data format and integrated process. This paper introduces a BIM based virtual environment supported by virtual reality (VR) and a serious game engine to address several key issues for building emergency management, for example, timely two-way in… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1
1

Citation Types

0
74
0
1

Year Published

2015
2015
2023
2023

Publication Types

Select...
4
4
1

Relationship

0
9

Authors

Journals

citations
Cited by 101 publications
(84 citation statements)
references
References 19 publications
0
74
0
1
Order By: Relevance
“…Recently, BIM has been used to improve building disaster management by understanding physical and functional characteristics of objects and visualizing building spatial information in three dimensions [25,26]. However, effective fire emergency methods should rely on the real-time and dynamic information [11].…”
Section: Bim and Ifcmentioning
confidence: 99%
“…Recently, BIM has been used to improve building disaster management by understanding physical and functional characteristics of objects and visualizing building spatial information in three dimensions [25,26]. However, effective fire emergency methods should rely on the real-time and dynamic information [11].…”
Section: Bim and Ifcmentioning
confidence: 99%
“…Suarez et al [11] use Google Glass so that learners can make instant inquiries with handsfree interaction (voice interaction). In disaster education, Wang et al [12] developed a 3D-simulator that allows HMD wearers to evacuate from a virtual building fire. We developed evacuation drill systems using AR and HMDs [13][14] [15].…”
Section: Related Workmentioning
confidence: 99%
“…Therefore, both CityGM L and IndoorGM L in GIS field cannot meet the requirement of data environment. In construction industry, Industry Foundation Classes (IFC) and Building Information M odel (BIM ) has been applied in building fire research also (Spearpoint, 2007;Dimyadi, 2008;Wang, 2014). However, IFC model was focuses on the information representation of architectural components, and the indoor space division was lacked, which is inadequate for building fire scene modelling also.…”
Section: Data Environmentmentioning
confidence: 99%