2019
DOI: 10.1016/j.autcon.2019.03.019
|View full text |Cite
|
Sign up to set email alerts
|

BIM-based Last Planner System tool for improving construction project management

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1
1

Citation Types

0
59
0
8

Year Published

2019
2019
2023
2023

Publication Types

Select...
5
4
1

Relationship

0
10

Authors

Journals

citations
Cited by 142 publications
(80 citation statements)
references
References 9 publications
0
59
0
8
Order By: Relevance
“…Several works concerned lean management. Although this is a philosophy derived from production engineering, its principles can help increase the efficiency and effectiveness of ongoing projects (Heigermoser et al, 2019), especially if they are integrated with other approaches, such as agile methodologies (Sohi et al, 2016;Rivera, and Kashiwagi, 2016) or Six Sigma (Tenera, and Pinto, 2014).…”
Section: Discussionmentioning
confidence: 99%
“…Several works concerned lean management. Although this is a philosophy derived from production engineering, its principles can help increase the efficiency and effectiveness of ongoing projects (Heigermoser et al, 2019), especially if they are integrated with other approaches, such as agile methodologies (Sohi et al, 2016;Rivera, and Kashiwagi, 2016) or Six Sigma (Tenera, and Pinto, 2014).…”
Section: Discussionmentioning
confidence: 99%
“…Thanks to the a-priori BIM-LPS interaction matrix filter and the rigorous focalization of this review procedure, most of such comprise BIM-LPS co-applications in construction execution. Several authors developed so-called "Lean IT-tools" which support one or many aspects of the LPS and provide a link to BIM models [22,23,49,55,84,86,89]. However, none of them supports the Last Planner ® System to its full extent, since the tools either support only collaborative phase planning [55], even neglect the collaborative aspects such as hand-offs discussion among last planners [22,23,49] or systematic task-breakdown [84,86,90] as stipulated in the current LPS process benchmark [91].…”
Section: Group 1: Production Planning and Control Supported By Bimmentioning
confidence: 99%
“…Carvajal-Arango et al (2019) summerized the relationships and synergies between the philosophies of lean and sustainable constructions, and to determine how the lean construction practices contribute to each dimension of sustainability (i.e., environmental, economic, social) during the construction phase of a project. The Building Information Modeling (BIM) was combined with Lean principles to improve efficiency of construction projects (Heigermoser et al, 2019). A construction management tool linked LPS with the 3D visualization to improve productivity and reduce construction waste.…”
Section: Causes Of Wastes and Lean Construction Implementationmentioning
confidence: 99%