Computing in Civil Engineering 2019 2019
DOI: 10.1061/9780784482421.024
|View full text |Cite
|
Sign up to set email alerts
|

BIM-Based Estimation of Wood Waste Stream: The Case of an Institutional Building Project

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1

Citation Types

0
2
0

Year Published

2022
2022
2024
2024

Publication Types

Select...
4
1
1

Relationship

0
6

Authors

Journals

citations
Cited by 6 publications
(2 citation statements)
references
References 11 publications
0
2
0
Order By: Relevance
“…In a similar way, there are BIM-based automated design and planning for the boarding of light-frame residential buildings that successfully preserve the know-how of senior trades people while also minimizing material waste in automating the boarding design and planning [99]. Also, in regard to waste material, there is a BIM-based estimation of wood-waste stream in the case of an institutional building project where the comparison of the estimated wood formwork waste quantities and the actual formwork quantities manipulated from model parameters reveals a total difference of 19.7% [100]. Finally, there is an automated BIM-cased "Computer Numerical Control" (from now on CNC) file generator for wood panel framing machines in construction manufacturing that allows for the generation of CNC files directly from a BIM model, thus reducing the reliance on third-party CAM/CAD tools and facilitating fully automated machine operations in offsite construction [101].…”
Section: Traditional Design and Construction In Wood For Modern Build...mentioning
confidence: 99%
“…In a similar way, there are BIM-based automated design and planning for the boarding of light-frame residential buildings that successfully preserve the know-how of senior trades people while also minimizing material waste in automating the boarding design and planning [99]. Also, in regard to waste material, there is a BIM-based estimation of wood-waste stream in the case of an institutional building project where the comparison of the estimated wood formwork waste quantities and the actual formwork quantities manipulated from model parameters reveals a total difference of 19.7% [100]. Finally, there is an automated BIM-cased "Computer Numerical Control" (from now on CNC) file generator for wood panel framing machines in construction manufacturing that allows for the generation of CNC files directly from a BIM model, thus reducing the reliance on third-party CAM/CAD tools and facilitating fully automated machine operations in offsite construction [101].…”
Section: Traditional Design and Construction In Wood For Modern Build...mentioning
confidence: 99%
“…Won and Cheng [94] developed a 4D BIM construction waste estimation system which relies on construction waste factors for the estimation of waste generation. Bakchan et al [95] presented a theoretical 4D BIM solution for construction waste disposal scheduling. However, according to Guera et al [34], existing 4D BIM applications for construction waste management present some deficiencies, such as only focusing on waste generated by rework activities, a lack of estimation for off-site recycling, and/or the use of fixed factors.…”
Section: Review Of 4d Bim Applicationsmentioning