BIM aided information and visualization repository for managing construction delay claims

Abstract: Delays in construction result in a multitude of negative effects on project performance, and severe dismays among participating parties. This study aims to digitize the traditional process of recording and managing the construction delays using Building Information Modeling (BIM). Extensive literature review followed by semi-structure interviews of 21 industry experts were carried out to identify the issues faced by construction stakeholders in managing construction delays. To resolve these issues, a plugin na… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
2
1

Citation Types

0
2
0
4

Year Published

2022
2022
2024
2024

Publication Types

Select...
5

Relationship

1
4

Authors

Journals

citations
Cited by 5 publications
(8 citation statements)
references
References 51 publications
0
2
0
4
Order By: Relevance
“…Obras atrasam no mundo todo (Salling; Leleur, 2015;Vick;Brilakis, 2018), frustrando as partes interessadas (Ali;Zahoor;Aibinu;Nasir;Tariq;Imran;Khan, 2021). No Reino Unido, 50% dos projetos de construção apresentaram atrasos na última década (Glenigan, 2015).…”
Section: Problemas Setoriaisunclassified
See 2 more Smart Citations
“…Obras atrasam no mundo todo (Salling; Leleur, 2015;Vick;Brilakis, 2018), frustrando as partes interessadas (Ali;Zahoor;Aibinu;Nasir;Tariq;Imran;Khan, 2021). No Reino Unido, 50% dos projetos de construção apresentaram atrasos na última década (Glenigan, 2015).…”
Section: Problemas Setoriaisunclassified
“…Em todo o mundo pode-se observar o atraso de entrega de obras (Salling; Leleur, 2015;Vick;Brilakis, 2018), trazendo insatisfação aos participantes de projeto (Ali;Zahoor;Aibinu;Nasir;Tariq;Imran;Khan, 2021). Pode-se observar diversas causas para o atraso de obras.…”
Section: Introductionunclassified
See 1 more Smart Citation
“…Looking at the required information for delay and disruption claims including site conditions, scheduling, progress, design, communications and payments etc., some of the modern technologies as described below can be integrated and used for collecting the required information: Building information modeling (BIM) : BIM is a recent innovative digital construction platform that can help in recording and demonstrating the changes in project design, specifications, scope and schedules, which can have a significant impact on the construction projects (Ali et al , 2021). It can provide an effective and efficient platform for collecting the required information and records for claims in construction projects (Ali et al , 2020).…”
Section: Opportunities For Future Research (Recommendations)mentioning
confidence: 99%
“…Building information modeling (BIM) : BIM is a recent innovative digital construction platform that can help in recording and demonstrating the changes in project design, specifications, scope and schedules, which can have a significant impact on the construction projects (Ali et al , 2021). It can provide an effective and efficient platform for collecting the required information and records for claims in construction projects (Ali et al , 2020).…”
Section: Opportunities For Future Research (Recommendations)mentioning
confidence: 99%