2013
DOI: 10.1016/j.autcon.2013.06.007
|View full text |Cite
|
Sign up to set email alerts
|

Bidding strategy to support decision-making by integrating fuzzy AHP and regression-based simulation

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
3
2

Citation Types

0
39
0

Year Published

2014
2014
2024
2024

Publication Types

Select...
6
1

Relationship

0
7

Authors

Journals

citations
Cited by 91 publications
(43 citation statements)
references
References 50 publications
0
39
0
Order By: Relevance
“…This investigation focused on urban bridges. Chou et al [79] applied a hierarchical structure Fuzzy AHP. Pan [80] suggested three different types of construction methods: full-span, pre-cast and launching, and applied Fuzzy AHP.…”
Section: Constructionmentioning
confidence: 99%
“…This investigation focused on urban bridges. Chou et al [79] applied a hierarchical structure Fuzzy AHP. Pan [80] suggested three different types of construction methods: full-span, pre-cast and launching, and applied Fuzzy AHP.…”
Section: Constructionmentioning
confidence: 99%
“…In another study, particularly in the field of construction industry, a regression-based simulation was combined with fuzzy AHP in order to support decision for bidding strategy on bridge construction projects. The fuzzy AHP was used to determine the weights of factors that influence the cost of bridge construction projects, while Monte Carlo simulation with a regression model was utilized for prediction of bid amounts that correspond to various confidence levels [52].…”
Section: Literature Reviewmentioning
confidence: 99%
“…FAHP can simulate the subjective judgment by the fuzzy linguistic transformed into fuzzy number [7], [17]- [20]. Using fuzzy set theory, this approach computes the weighted values of factors that significantly affect the result of a project [1]. Chang introduced a extent of the fuzzy AHP [21].…”
Section: Literature Reviewmentioning
confidence: 99%
“…At present, few literatures study on whether to participate in project bidding to obtain the maximum self-interest from the contractor's perspective, rather than from the owner" perspective [1]- [3]. And the fact of matter is renewable energy building is blind to pursuit of technology and high economic costs or to focus only on the economic costs of renewable energy and ignoring technology.…”
Section: Introductionmentioning
confidence: 99%
See 1 more Smart Citation