1962
DOI: 10.1109/aieepas.1962.4501437
|View full text |Cite
|
Sign up to set email alerts
|

Bibliography on Optimum Operation of Power Systems: 1919-1959

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2

Citation Types

0
2
0

Year Published

1962
1962
1987
1987

Publication Types

Select...
4
2

Relationship

0
6

Authors

Journals

citations
Cited by 12 publications
(2 citation statements)
references
References 116 publications
0
2
0
Order By: Relevance
“…The generation scheduling problem, also referred to as unit commitment or predispatch [1], has been the SUbject oE considerable discussion in thf! power literature [2,3,4].…”
Section: Introductionmentioning
confidence: 99%
“…The generation scheduling problem, also referred to as unit commitment or predispatch [1], has been the SUbject oE considerable discussion in thf! power literature [2,3,4].…”
Section: Introductionmentioning
confidence: 99%
“…A non-optimal generation schedule is most likely to offset the savings that are expected through economic dispatch efforts, therefore resulting in an inefficient system operation. Historically, economic dispatch techniques were developed first and then there was a question of how to bring on line or take off line the generating units in the first place (Happ, 1977;Noakes and Arismunder, 1963).…”
Section: Introductionmentioning
confidence: 99%