Best-Value Model Based on Project Specific Characteristics

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
3
1

Citation Types

0
34
0
1

Year Published

2010
2010
2021
2021

Publication Types

Select...
8
2

Relationship

0
10

Authors

Journals

citations
Cited by 52 publications
(35 citation statements)
references
References 4 publications
0
34
0
1
Order By: Relevance
“…As addressed previously, the critical point to select the most appropriate procurement method is to determine the 'heterogeneity' of the project. The 'heterogeneity' of a project is actually determined by the capability of the contractors available in the market, who are able to deliver the project results with different performances, e.g., time, cost, image, aesthetics/appearance, operation and maintenance, managerial safety and environmental aspects, and many other factors [10,11,12]. If the procurement market is relatively highly heterogeneous, the heterogeneous procurement method such as BV and HLT should be adopted; otherwise, the homogeneous procurement method (e.g., LT) should be adopted.…”
Section: Relevant Workmentioning
confidence: 99%
“…As addressed previously, the critical point to select the most appropriate procurement method is to determine the 'heterogeneity' of the project. The 'heterogeneity' of a project is actually determined by the capability of the contractors available in the market, who are able to deliver the project results with different performances, e.g., time, cost, image, aesthetics/appearance, operation and maintenance, managerial safety and environmental aspects, and many other factors [10,11,12]. If the procurement market is relatively highly heterogeneous, the heterogeneous procurement method such as BV and HLT should be adopted; otherwise, the homogeneous procurement method (e.g., LT) should be adopted.…”
Section: Relevant Workmentioning
confidence: 99%
“…For example, Abdelrahman et al (2008) for one, introduced a concept of best value modelling that was specific to each project; combing two application method: the weighted average method and AHP method. Their tool ranked contractors on best value by using a methodology for quantifying the qualitative effect of subjective factors in the selection process.…”
Section: Introductionmentioning
confidence: 99%
“…Selecting an appropriate contractor is essential to the successful implementation of a construction project. Although the lowest-bid method is typically adopted to award contracts for most public construction projects, the Best-Value (BV) approach (also called the most-advantageous tendering approach in Taiwan or the most economically advantageous tender method is European countries) has recently been receiving considerable attention in many countries (Yang, Wang 2003;Ohno, Harada 2006;Scott et al 2006;Waara, Bröchner 2006;Abdelrahman et al 2008;Elyamany, Abdelrahman 2010).…”
Section: Introductionmentioning