“…As addressed previously, the critical point to select the most appropriate procurement method is to determine the 'heterogeneity' of the project. The 'heterogeneity' of a project is actually determined by the capability of the contractors available in the market, who are able to deliver the project results with different performances, e.g., time, cost, image, aesthetics/appearance, operation and maintenance, managerial safety and environmental aspects, and many other factors [10,11,12]. If the procurement market is relatively highly heterogeneous, the heterogeneous procurement method such as BV and HLT should be adopted; otherwise, the homogeneous procurement method (e.g., LT) should be adopted.…”