2013
DOI: 10.1016/j.resconrec.2013.03.009
|View full text |Cite
|
Sign up to set email alerts
|

Best practice measures assessment for construction and demolition waste management in building constructions

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
3
1
1

Citation Types

2
31
0
1

Year Published

2014
2014
2023
2023

Publication Types

Select...
5
2

Relationship

0
7

Authors

Journals

citations
Cited by 100 publications
(43 citation statements)
references
References 26 publications
2
31
0
1
Order By: Relevance
“…Relevant research in this area has been conducted in Spain. Most of the studies focused on describing models for the design stage to estimate the volume of C&D waste that will be generated on a site (Mañà et al, 2000;Solís-Guzman et al, 2009;Martínez et al, 2010;Llatas, 2011;Marrero et al, 2011;de Guzmán et al, 2012;Villoria et al 2012). In other initiatives, such as those led by Ortiz et al (2010) and Mercante et al (2012), the research was based on life cycle assessment.…”
Section: Introductionmentioning
confidence: 99%
See 2 more Smart Citations
“…Relevant research in this area has been conducted in Spain. Most of the studies focused on describing models for the design stage to estimate the volume of C&D waste that will be generated on a site (Mañà et al, 2000;Solís-Guzman et al, 2009;Martínez et al, 2010;Llatas, 2011;Marrero et al, 2011;de Guzmán et al, 2012;Villoria et al 2012). In other initiatives, such as those led by Ortiz et al (2010) and Mercante et al (2012), the research was based on life cycle assessment.…”
Section: Introductionmentioning
confidence: 99%
“…Solís-Guzman et al (2013) determined the ecological footprint related to C&D waste. However, little attention has been paid to best practices of C&D waste management in the European Union (Villoria et al, 2013). Effective waste management practices are undoubtedly the best way to achieve a more sustainable scenario characterized by C&D waste prevention and high recovery rates.…”
Section: Introductionmentioning
confidence: 99%
See 1 more Smart Citation
“…Crane operators were in charge of transferring and emptying the small containers, by means of a crane, from the installation area to the specific PB container at the construction site. It should be noted that the use of such small containers has been already identified as a best practice in the literature [14,20,22]. The installation works were carried out according to the following sequence:…”
Section: Methodsmentioning
confidence: 99%
“…However, one of the foremen explained that 2 or 3 containers out of 10 are revised at the installation area in order to check that the PB waste was properly segregated. Villoria-Sáez et al and Lu and Yuan have also studied the supervision of C&D waste on-site, as a factor for the successful C&D waste management [13] and as a best practice measure in the form of periodic checks on the use of C&D waste containers [14].…”
Section: Fulfilling the Requirements Established By The Current Regulmentioning
confidence: 99%