1983
DOI: 10.1016/0148-9062(83)90797-0
|View full text |Cite
|
Sign up to set email alerts
|

Bearing capacity of pile preloaded by downdrag

Abstract: SYNOPSISAn instrumented steel-pipe pile, 49 m long, driven through a highway embankment into a deep deposit of compressible marine clay accumulated a peak downdrag load PN of 1.52 MN after 10 years. After the pile was filled with concrete, a comprehensive load-testing program was carried out over a period of 20 days to investigate the load-carrying capability of the pile. The locked-in downdrag load behaved as stored energy in the pile. Transient and short-term live loads up to PN and cyclic loads to stress le… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...

Citation Types

0
0
0

Publication Types

Select...

Relationship

0
0

Authors

Journals

citations
Cited by 0 publications
references
References 4 publications
(6 reference statements)
0
0
0
Order By: Relevance

No citations

Set email alert for when this publication receives citations?