strength for low intensity conm_issioning of the An overview of beam instrumentation requirements at the superconducting rings, while maintaining well controlled SSC and a status report on work progress is given. Small impedances presented to the beam. The shorted-end design transverse emittance beams, ranging in energy from 30 KeV to halves the number of signal feedthroughs required relative to 20 TeV, must be commissioned, measured, and diagnosed, an externally terminated design and eliminates reliability Instrumentation plans and current design and development concerns of an internally terminated design. Additionally, the efforts for BPMs and other systems are presented. Monitors shorted-end pickup exhibits no directionality, permitting it to and electronics soon to be delivered for use in the Linac are be used in the HEB where beams circulate opposite directions described. Design of the Linac systems has been done with from one cycle to the next and in the LEB where mechanical requirements and applications in the synchrotrons in mind and constraints require pickup installation in alternating thus should provide a basis for design of much of that longitudinal orientations. hardware. The useful commonality of design across the The HEB and Collider BPMs, located within the cryogenic machines is discussed, spool pieces, must be designed to operate reliably and predictably at 4°K and through numerous temperature cycles