2009
DOI: 10.1103/physrevstab.12.040402
|View full text |Cite
|
Sign up to set email alerts
|

Beam commissioning of the 3-GeV rapid cycling synchrotron of the Japan Proton Accelerator Research Complex

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1
1

Citation Types

0
23
0

Year Published

2010
2010
2021
2021

Publication Types

Select...
8

Relationship

1
7

Authors

Journals

citations
Cited by 58 publications
(24 citation statements)
references
References 8 publications
0
23
0
Order By: Relevance
“…After performing the initial beam tuning and a series of underlying beam studies with low-intensity beams to examine the basic lattice properties [2], we have been conducting beam tuning experiments with high-intensity beams including the injection painting scheme since December 2009. In this section, the results of a highintensity trial experiment performed in January 2011 are mainly described together with the corresponding numerical simulation results.…”
Section: Experimental Results and Discussion With Numerical Simumentioning
confidence: 99%
See 1 more Smart Citation
“…After performing the initial beam tuning and a series of underlying beam studies with low-intensity beams to examine the basic lattice properties [2], we have been conducting beam tuning experiments with high-intensity beams including the injection painting scheme since December 2009. In this section, the results of a highintensity trial experiment performed in January 2011 are mainly described together with the corresponding numerical simulation results.…”
Section: Experimental Results and Discussion With Numerical Simumentioning
confidence: 99%
“…The RCS was commissioned in October 2007 and made available for user operation in December 2008 with an output beam power of 4-20 kW. By a series of underlying beam tests with such lowintensity beams [2], the output beam power from the RCS in the routine user operation was increased to 120 kW in December 2009 and to 210 kW in December 2010. Since then, our efforts have been focused on parameter tuning for higher-intensity beams including the injection painting technique.…”
Section: Introductionmentioning
confidence: 99%
“…Accurate estimation of the beam behavior was established by including detailed characteristics for each accelerator component in the simulations, which in turn enabled such very low loss operation [22,23].…”
Section: Resultsmentioning
confidence: 99%
“…4. In the figure, #n is the cavity number (1)(2)(3)(4)(5)(6)(7)(8)(9)(10)(11). The commissioning of the feedforward system is performed for each cavity.…”
Section: Commissioning Of the Feedforward Systemmentioning
confidence: 99%
“…In the 3 GeV rapid cycling synchrotron (RCS) of the Japan Proton Accelerator Research Complex (J-PARC) [1][2][3]. the magnetic-alloy (MA) loaded cavities are employed to generate the high accelerating voltage, which is necessary to accelerate high intensity proton beams.…”
Section: Introductionmentioning
confidence: 99%