2022
DOI: 10.1016/j.segan.2022.100854
|View full text |Cite
|
Sign up to set email alerts
|

Battery energy storage integration in wind farms: Economic viability in the Spanish market

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1

Citation Types

0
3
0
1

Year Published

2023
2023
2024
2024

Publication Types

Select...
6
1

Relationship

0
7

Authors

Journals

citations
Cited by 11 publications
(4 citation statements)
references
References 27 publications
0
3
0
1
Order By: Relevance
“…where F i (P Gi ) is a quadratic cost function of i th generator or BESS defined by k∈K (a i +b i P k Gi +c i (P k Gi ) 2 ) with a i , b i , c i cost coefficients. The function Fj (•) is the cost of degradation of the j th BESS described by B c,j δ∈∆ f c (C δ j )f d (D δ j ) where: B c,j is the battery cost, f c (C δ j ) and f d (D δ j ) are capacity-loss functions due to the number of cycles C δ j and DODs D δ j that occurs in the programming horizon, more details are provided by (20) in Section IV. We assume that F is convex to guarantee a global minimum in the problem.…”
Section: B Active-power Dispatch Problem Considering Battery Energy-s...mentioning
confidence: 99%
See 1 more Smart Citation
“…where F i (P Gi ) is a quadratic cost function of i th generator or BESS defined by k∈K (a i +b i P k Gi +c i (P k Gi ) 2 ) with a i , b i , c i cost coefficients. The function Fj (•) is the cost of degradation of the j th BESS described by B c,j δ∈∆ f c (C δ j )f d (D δ j ) where: B c,j is the battery cost, f c (C δ j ) and f d (D δ j ) are capacity-loss functions due to the number of cycles C δ j and DODs D δ j that occurs in the programming horizon, more details are provided by (20) in Section IV. We assume that F is convex to guarantee a global minimum in the problem.…”
Section: B Active-power Dispatch Problem Considering Battery Energy-s...mentioning
confidence: 99%
“…These strategies ensure that the state of charge of the batteries is within appropriate ranges at any time. For instance, the authors in [14] and [20] manage storage systems to meet technical and economic goals over a long-term horizon. The main drawback of long-term planning for battery management is that the ability to deal with short-term disturbances is seriously affected.…”
Section: Introductionmentioning
confidence: 99%
“…Economic viability of BESS integration varies depending on the location and the local grid power purchasing agreement. Lobato et al [31] evaluated the economic viability of BESS fora 30 MW wind farm in the Spanish market. In this case, Li-ion and Vanadium-Redox (Va-Red) are used to evaluate the economic feasibility as BESS initial investment cost and efficiencies are not the same, but end-of-life (EoL), EoL efficiency, and number of cycles per day are the same.…”
Section: Introductionmentioning
confidence: 99%
“…En la actualidad, en una variedad de países se disponen de bancos de baterías de unas decenas de MW para lograr insertar en la red la energía extraída de grandes granjas eólicas [18] [19].…”
Section: Energía Eólicaunclassified