2022
DOI: 10.1007/978-3-031-04583-7_1
|View full text |Cite
|
Sign up to set email alerts
|

Basics in Lean Management

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1

Citation Types

0
1
0

Year Published

2022
2022
2024
2024

Publication Types

Select...
1
1

Relationship

0
2

Authors

Journals

citations
Cited by 2 publications
(1 citation statement)
references
References 19 publications
0
1
0
Order By: Relevance
“…The waiting Muda is the entire time of non-value-added operations [49,50]. Following field observations, one can deduce that an operator loses on average 46.7% of its operating time (equivalent to 3 h 58 min) just in waiting, both in the production line and in the buffer stock.…”
Section: Waiting Muda Of Line Feedersmentioning
confidence: 93%
“…The waiting Muda is the entire time of non-value-added operations [49,50]. Following field observations, one can deduce that an operator loses on average 46.7% of its operating time (equivalent to 3 h 58 min) just in waiting, both in the production line and in the buffer stock.…”
Section: Waiting Muda Of Line Feedersmentioning
confidence: 93%