Proceedings of the 9th World Construction Symposium 2021 on Reshaping Construction: Strategic, Structural and Cultural Transfor 2021
DOI: 10.31705/wcs.2021.14
|View full text |Cite
|
Sign up to set email alerts
|

Barriers in Practicing Life Cycle Costing Techniques Experienced by Sri Lankan Quantity Surveyors

Abstract: Life Cycle Costing (LCC) is a tool, which can evaluate all the building-related costs over a specified period of time, as mentioned in the agreed scope. Though there are number of benefits, LCC practices of consultants in the building industry are claimed to be weak. Hence, the aim of this research is to investigate barriers in practicing LCC techniques experienced by Sri Lankan quantity surveyors. Accordingly, a mixed approached was followed in data collection through a questionnaires survey and a series of e… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1

Citation Types

0
3
0

Year Published

2022
2022
2023
2023

Publication Types

Select...
1
1

Relationship

0
2

Authors

Journals

citations
Cited by 2 publications
(3 citation statements)
references
References 20 publications
(29 reference statements)
0
3
0
Order By: Relevance
“…This shows that the majority of the respondents do not have a source for running cost data. Although some of the questionnaire respondents highlighted having sources for running cost data, it was contrary to the interviewees, where all responded to not having a source (Manege and Kennedy, 2020;Sandaruwan, et al, 2021) and other cost estimations needed in the building construction industry.…”
Section: Running Cost Data Sourcementioning
confidence: 95%
See 1 more Smart Citation
“…This shows that the majority of the respondents do not have a source for running cost data. Although some of the questionnaire respondents highlighted having sources for running cost data, it was contrary to the interviewees, where all responded to not having a source (Manege and Kennedy, 2020;Sandaruwan, et al, 2021) and other cost estimations needed in the building construction industry.…”
Section: Running Cost Data Sourcementioning
confidence: 95%
“…Results of whole life costing are often put into question due to lack of enough cost data (Sterner, 2000), and when they are available, they are usually inconsistent or not relevant for usage (El-Haram, et al, 2002). Manege and Kennedy (2020) and Sandaruwan, et al (2021) revealed that lack of reliable cost data is one of the key barriers to whole life costing application in the Tanzania building construction industry. According to Munro (2018), a problem in cost data availability in the building construction industry is getting worse.…”
Section: Introductionmentioning
confidence: 99%
“… [1] (Fisher et al , 2008), [2] (Xia et al , 2016), [3] (Ruparathna and Hewage, 2015), [4] (Tony, 2013), [5] (Latiffi et al , 2016), [6] (Nagalingam et al , 2013), [7] (Wong and Zhou, 2015), [8] (Bowen et al , 2010), [9] (Chamikara et al , 2020), [10] (Sandaruwan et al , 2021), [11] (Omotayo et al , 2023), [12] (Yap et al , 2022)…”
Section: Table 11mentioning
confidence: 99%