2016
DOI: 10.30684/etj.34.2a.4
|View full text |Cite
|
Sign up to set email alerts
|

Balancing Mixed-Model Assembly line in Electronic Industries Company

Abstract: In this work, an approach to solve mixed-model assembly line balancing Problem has been suggested which consists of six stages. In the fourth stage of this approach, a heuristic method is suggested for solving the combined model. This method is programmed using C# language. This program is called "Assembly line balancing-Method of Merging Shortest and Longest Operation" symbol by (MMSLO), which is based on merging two heuristic methods "Shortest Operation time" (SOT) and "Longest Operation Time" (LOT). This ap… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1

Citation Types

0
1
0

Year Published

2020
2020
2023
2023

Publication Types

Select...
4

Relationship

0
4

Authors

Journals

citations
Cited by 4 publications
(1 citation statement)
references
References 2 publications
(3 reference statements)
0
1
0
Order By: Relevance
“…For a single line model, two general groups depending on their configuration are commonly seen: traditional straight lines and U-shaped lines: traditional straight production line organizes the tasks sequentially in one direction to form stations, and U-shaped production line, however, is divided into two sub-lines, namely, the entrance sub-line and the exit subline, and, thus, an operator may perform tasks on either one of the two sub-lines or on both sub-lines simultaneously 2 . In single-model line, there is only one model and precedence diagram 3 . The classification of a bottleneck may vary.…”
Section: Introductionmentioning
confidence: 99%
“…For a single line model, two general groups depending on their configuration are commonly seen: traditional straight lines and U-shaped lines: traditional straight production line organizes the tasks sequentially in one direction to form stations, and U-shaped production line, however, is divided into two sub-lines, namely, the entrance sub-line and the exit subline, and, thus, an operator may perform tasks on either one of the two sub-lines or on both sub-lines simultaneously 2 . In single-model line, there is only one model and precedence diagram 3 . The classification of a bottleneck may vary.…”
Section: Introductionmentioning
confidence: 99%