2013
DOI: 10.1007/s10601-013-9142-6
|View full text |Cite
|
Sign up to set email alerts
|

Balancing and scheduling of flexible mixed model assembly lines

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1
1

Citation Types

0
5
0
2

Year Published

2014
2014
2023
2023

Publication Types

Select...
7

Relationship

1
6

Authors

Journals

citations
Cited by 37 publications
(10 citation statements)
references
References 44 publications
0
5
0
2
Order By: Relevance
“…This study is a continuation and extension of authors' earlier works [7] and [10]. The MIP model proposed in the previous work of the author's to solve the non-cyclic version of this problem has a great advantage on proving optimality due to its ability to use LP relaxation in search tree [19].…”
Section: Introductionmentioning
confidence: 80%
See 3 more Smart Citations
“…This study is a continuation and extension of authors' earlier works [7] and [10]. The MIP model proposed in the previous work of the author's to solve the non-cyclic version of this problem has a great advantage on proving optimality due to its ability to use LP relaxation in search tree [19].…”
Section: Introductionmentioning
confidence: 80%
“…However, since products are not removed from the line until the last stage, product 6 remains on the line until the job <4,6> starts in station (15,5) at 34th minute. Therefore, product 6 blocks the station (6,2) in between the 29th and 32th minutes, then it is transferred to station (7,3) in the third stage and it blocks this station in between 32th and 34th minutes. Next, it is moved to station (11,4) in stage four at 34th minute and immediately it is transferred to station (15,5) in stage five.…”
Section: Products (P)mentioning
confidence: 99%
See 2 more Smart Citations
“…Öztürk ve diğ. [40] karma modelli montaj hattını ele aldıkları çalışmalarında montaj hattı problemini bir çizelgeleme problemi gibi ele alıp, bütün ürünlerin üretiminin tamamlanması için gerekli bütün görevlerin bitiş zamanını minimize etmeyi amaçlamışlardır. Problemde görev ataması, görev sıralaması ve ürün sıralamasını yapan bir metodoloji önermişlerdir.…”
Section: O N T a J H A T T Iunclassified