2016
DOI: 10.1002/we.2011
|View full text |Cite
|
Sign up to set email alerts
|

Availability, operation and maintenance costs of offshore wind turbines with different drive train configurations

Abstract: Different configurations of gearbox, generator and power converter exist for offshore wind turbines. This paper investigated the performance of four prominent drive train configurations over a range of sites distinguished by their distance to shore. Failure rate data from onshore and offshore wind turbine populations was used where available or systematically estimated where no data was available. This was inputted along with repair resource requirements to an offshore accessibility and operation and maintenan… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1
1

Citation Types

2
108
0

Year Published

2017
2017
2018
2018

Publication Types

Select...
6
1
1

Relationship

2
6

Authors

Journals

citations
Cited by 119 publications
(110 citation statements)
references
References 17 publications
2
108
0
Order By: Relevance
“…Thus only failure rates can be compared [52]. Further publications [53,54] of Carroll et al also make use of the described data source and furthermore include results on onshore WT. These publications focus on differences between drive train concepts and are thus not considered in the present comparison.…”
Section: Muppandal Wind Farm (India)mentioning
confidence: 99%
“…Thus only failure rates can be compared [52]. Further publications [53,54] of Carroll et al also make use of the described data source and furthermore include results on onshore WT. These publications focus on differences between drive train concepts and are thus not considered in the present comparison.…”
Section: Muppandal Wind Farm (India)mentioning
confidence: 99%
“…Multiple factors impact the IAV of net AEP from operating wind farms including but not limited to curtailment for system operation and/or WT maintenance (Clifton et al, 2016), WT wake losses (Clifton et al, 2016;Barthelmie et al, 2013), and 10 wind speed variability. Here we focus on this last factor.…”
Section: Simulationsmentioning
confidence: 99%
“…Onshore availability typically exceeds 98% (Carroll et al, 2017), but tends to decrease with WT age (Olauson et al, 2017). Thus gross CF derived from the WRF simulations that assume 100% WT availability (i.e.…”
Section: 2018) Annual Gross Capacity Factors (Cf) For Grid 15mentioning
confidence: 99%
See 1 more Smart Citation
“…Based on [27] and [28], for a 6MW wind turbine with a 90m hub height in 30m water depth, the relationship of substructure and foundation mass, msf with top head mass can be given as (20) Using the steel cost from Table III (assuming 60% pile and 40% transition piece and outfitting steel), The effect of any increased generator mass on the turbine substructure and foundation cost, Csf (k€) can be approximated by a linear function for 400 < mtop < 600 tonnes as, (21) E. Optimization Design optimization methods generally use an algorithm which take independent variables as input and vary those input to evaluate dependent variables in machine model and hence optimize an objective function (subject to predetermined constraints). In this paper, the independent variables and constraints are described in the following subsection 1.…”
Section: Tower and Foundation Costmentioning
confidence: 99%