2017
DOI: 10.22260/isarc2017/0060
|View full text |Cite
|
Sign up to set email alerts
|

Automating the Generation of Indoor Space Topology for 3D Route Planning Using BIM and 3D-GIS Techniques

Abstract: Abstract3D Indoor space topology, mainly referred as floor layouts and navigation routes, is the foundation of indoor Location-based Services (LBS), such as navigation in large shopping malls or interchange in large transport stations. Manually generating this topology is highly time-consuming, less cost effective, and prone to errors. This research adopts 3-D GIS technology and proposes a novel workflow to automatically generate the indoor space topology based on 3D building models in a format of Industry Fou… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
3
2

Citation Types

0
8
0

Year Published

2020
2020
2024
2024

Publication Types

Select...
4
1
1

Relationship

1
5

Authors

Journals

citations
Cited by 7 publications
(8 citation statements)
references
References 6 publications
0
8
0
Order By: Relevance
“…Lin et al proposed an indoor topology generation framework called i-GIT, which can automatically construct indoor networks including level and non-level paths [26]. The i-GIT algorithm only needs to read a 3D building model that complies with the IFC2x, 2x2, or 2x3 formats.…”
Section: Indoor Spaces For Emergency Responsementioning
confidence: 99%
See 4 more Smart Citations
“…Lin et al proposed an indoor topology generation framework called i-GIT, which can automatically construct indoor networks including level and non-level paths [26]. The i-GIT algorithm only needs to read a 3D building model that complies with the IFC2x, 2x2, or 2x3 formats.…”
Section: Indoor Spaces For Emergency Responsementioning
confidence: 99%
“…The i-GIT algorithm only needs to read a 3D building model that complies with the IFC2x, 2x2, or 2x3 formats. With little manual pre-processing, the algorithm can automatically generate a graph-based indoor space model of multi-story buildings [26]. The novelty of the i-GIT approach lies in automatic generation of non-floor paths, such as stairs, ramps, and elevators.…”
Section: Indoor Spaces For Emergency Responsementioning
confidence: 99%
See 3 more Smart Citations