Automatic load sharing of distribution transformer for overload protection

Abstract: Objective: Load sharing provides sufficient protection to distribution transformer under overloaded conditions. Due to overload on transformer, the efficiency drops and windings get overheated and may burn. By sharing a load current on transformer for each phase the transformer was protected. Therefore, the objective of this study was to protect transformers from overloaded conditions by sharing the load. Result: The system automatically connects and disconnects switch to share the transformer loads. The contr… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
3
1
1

Citation Types

0
9
0

Year Published

2021
2021
2023
2023

Publication Types

Select...
5
3

Relationship

1
7

Authors

Journals

citations
Cited by 11 publications
(9 citation statements)
references
References 19 publications
0
9
0
Order By: Relevance
“…• If the system voltages remain within the specified limits and selected in divergent emergency conditions [23]. • If equipment is overloaded such as transformers and cables.…”
Section: Discussionmentioning
confidence: 99%
See 1 more Smart Citation
“…• If the system voltages remain within the specified limits and selected in divergent emergency conditions [23]. • If equipment is overloaded such as transformers and cables.…”
Section: Discussionmentioning
confidence: 99%
“…• Identify transformer tap settings [6]. Continuous and comprehensive analysis of an electrical system is required to assess the current state of the system and to evaluate the optional plans for system expansion.…”
Section: Introductionmentioning
confidence: 99%
“…Controller system was designed to manage demand and available energy resources to reduce the power interruption due to the intermittent nature of energy sources. Fuzzy controller switches the load to available energy sources to satisfy the demand in 24 h. Thus, there is no need of battery and charge controller (Lü 2020;Chen et al 2020;Nebey 2020;Hailemariam et al 2015). Controller is important to efficiently manage the energy balance between the total generation and the total demand.…”
Section: Controller Systemmentioning
confidence: 99%
“…The government and community have controversial feedbacks regarding the problem. According to some people it is due to rapid growth of country and some contend that it has to do with failure of aged and transmission and distribution lines of power transformers (Nebey, 2020). Losses of the power system are also increased by the occurrence of faults, so faults should be removed at the earliest and corrective measures for example to isolate the fault must be considered.…”
Section: Introductionmentioning
confidence: 99%
“…This issue is solved by linking another transformer by relay in parallel with the main transformer (Nebey, 2020). The PLC is designed to verify the overloading of the first transformer and, if this condition occurs, the second transformer is automatically connected parallel to the first transformer and the load is shared.…”
Section: Introductionmentioning
confidence: 99%