Construction Research Congress 2014 2014
DOI: 10.1061/9780784413517.103
|View full text |Cite
|
Sign up to set email alerts
|

Automated Registration of 3D Point Clouds with 3D CAD Models for Remote Assessment of Staged Fabrication

Abstract: Modularization and pre-assembly are parts of a trend toward staged fabrication that has been developing in the construction industry in many parts of the world over the past few decades. Successful delivery and transportation of materials in staged fabrication processes has always been a key challenge. While substantial advances in modularization and pre-fabrication have been achieved recently, there is still a significant rate of damages and defects occurring during transportation and shipment. In addition, t… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1
1

Citation Types

0
8
0

Year Published

2015
2015
2023
2023

Publication Types

Select...
6

Relationship

1
5

Authors

Journals

citations
Cited by 7 publications
(8 citation statements)
references
References 17 publications
0
8
0
Order By: Relevance
“…The errors causing the rework were not detected before conducting the works, and this proves that the information related to unit production and lifting were not applied to the design. Owing to the nature of modular construction work, any changes made onsite are not only difficult but also prohibitive in terms of cost [12,13,36]. In other words, if the design phase is not coordinated properly, modular construction can cost much more than stick-built construction [2,6,12,22,26,27].…”
Section: Rework In Modular Construction Projectsmentioning
confidence: 99%
See 3 more Smart Citations
“…The errors causing the rework were not detected before conducting the works, and this proves that the information related to unit production and lifting were not applied to the design. Owing to the nature of modular construction work, any changes made onsite are not only difficult but also prohibitive in terms of cost [12,13,36]. In other words, if the design phase is not coordinated properly, modular construction can cost much more than stick-built construction [2,6,12,22,26,27].…”
Section: Rework In Modular Construction Projectsmentioning
confidence: 99%
“…This multilateral information exchange increases the complexity of the To support the design phase of modular constructions, several studies have been conducted previously [36][37][38][39][40]. Nahangi et al, proposed an automated approach for monitoring the defection and damage of modular units using laser scanned data [36]. Han et al, developed an optimization model for tower crane operation that can be used in the planning phase [39].…”
Section: Information Flow In the Design Processmentioning
confidence: 99%
See 2 more Smart Citations
“…Current approaches for inspection of facilities and investigation of the as-built status of segments to avoid causing huge costs are not sufficiently effective and accurate [10]. Most of the approaches deal with intensively manual interaction which is inaccurate.…”
Section: Introductionmentioning
confidence: 99%