Automated production planning in panelized construction enabled by integrating discrete-event simulation and BIM

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1

Citation Types

0
0
0

Year Published

2018
2018
2023
2023

Publication Types

Select...
2
2
1

Relationship

0
5

Authors

Journals

citations
Cited by 12 publications
(1 citation statement)
references
References 0 publications
0
0
0
Order By: Relevance
“…Stochastic factors (e.g., triangular distribution) were also incorporated in the regression models to account for uncertainties such as worker performance or machine breakdown. Similar estimation methods have been used in other studies to estimate the processing times at workstations [18][19][20]. Such approaches constitute an improvement upon using a single average value to model the duration of an entire process at a workstation.…”
Section: Process Time Estimation Methodsmentioning
confidence: 94%
“…Stochastic factors (e.g., triangular distribution) were also incorporated in the regression models to account for uncertainties such as worker performance or machine breakdown. Similar estimation methods have been used in other studies to estimate the processing times at workstations [18][19][20]. Such approaches constitute an improvement upon using a single average value to model the duration of an entire process at a workstation.…”
Section: Process Time Estimation Methodsmentioning
confidence: 94%