2018
DOI: 10.1016/j.autcon.2018.07.023
|View full text |Cite
|
Sign up to set email alerts
|

Automated optimization of formwork design through spatial analysis in building information modeling

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
3
2

Citation Types

0
20
0

Year Published

2019
2019
2024
2024

Publication Types

Select...
4
3
1

Relationship

0
8

Authors

Journals

citations
Cited by 42 publications
(28 citation statements)
references
References 14 publications
0
20
0
Order By: Relevance
“…A cascade method was proposed which extracts required data (such as quantity take-off and construction phases) from the BIM model and uses them to design a formwork system for the project [5]. Industry Foundation Classes (IFC) schema was employed to optimize formwork design of concrete walls in building construction [11]. Later, a method was proposed to increase the proportion of the modular forms to increase formwork efficiency [12].…”
Section: Introductionmentioning
confidence: 99%
“…A cascade method was proposed which extracts required data (such as quantity take-off and construction phases) from the BIM model and uses them to design a formwork system for the project [5]. Industry Foundation Classes (IFC) schema was employed to optimize formwork design of concrete walls in building construction [11]. Later, a method was proposed to increase the proportion of the modular forms to increase formwork efficiency [12].…”
Section: Introductionmentioning
confidence: 99%
“…However, it is customary to assume constant activation energy. The concrete's strength was estimated using parabolic Equation (2).…”
Section: System Validation and Case Studymentioning
confidence: 99%
“…By employing Equation (1), the equivalent time t e24 was calculated for a normal day of the month. The times t 50% , t 70% , and t 85% were required for the concrete to gain 50%, 70%, and 85% of its designed compressive strength, respectively, at the reference temperature (i.e., 20 • C); these were calculated using Equation (2). The times t e50% , t e70% , and t e85% were required for the concrete to gain 50%, 70%, and 85% of its designed compressive strength, respectively, at the site temperature.…”
Section: System Validation and Case Studymentioning
confidence: 99%
See 1 more Smart Citation
“…Hitherto, pertinent studies on the applications of BIM for concrete work have been limited to either improving supply chain management or enhancing the quality of precast components on projects [48,49], or estimating the costs of production and reducing the carbon footprint of concrete structures [23,62]. Hyun et al [41] represented the only study with the closest alignment to the topic and sought to use BIM in designing cast-in-place concrete formwork. At present, there is a notable dearth of research that explores BIM's capabilities for controlling joints, and initial attempts to provide automated procedures still remain in their infancy stages [63,78].…”
Section: Introductionmentioning
confidence: 99%