2014
DOI: 10.1016/j.engappai.2014.02.003
|View full text |Cite
|
Sign up to set email alerts
|

Automated guided vehicles fleet match-up scheduling with production flow constraints

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1
1

Citation Types

1
27
0

Year Published

2015
2015
2023
2023

Publication Types

Select...
5
2

Relationship

2
5

Authors

Journals

citations
Cited by 41 publications
(28 citation statements)
references
References 18 publications
1
27
0
Order By: Relevance
“…AGVs fleet sizing, assignment and scheduling [2,3]. Opposite to usually studied deterministic cases where demand is known in advance and the processing times of each job on each machine is a known constant, the problem considered in this paper assumes a given transportation system encompassing the network of AGVs periodically circulating along cyclic routes while servicing work pieces load/unload operations.…”
Section: Introductionmentioning
confidence: 99%
“…AGVs fleet sizing, assignment and scheduling [2,3]. Opposite to usually studied deterministic cases where demand is known in advance and the processing times of each job on each machine is a known constant, the problem considered in this paper assumes a given transportation system encompassing the network of AGVs periodically circulating along cyclic routes while servicing work pieces load/unload operations.…”
Section: Introductionmentioning
confidence: 99%
“…Consequently, the problem considered in this research can be seen as an extension and/or refining of the problems formulated in our former works (Bocewicz and Banaszak 2013;Bocewicz et al 2014aBocewicz et al , b, 2015Bocewicz et al , 2016Nielsen et al 2016) focused on a solution to a constraint satisfaction problem aimed at AGVs fleet match-up scheduling while taking into account fuzzy operation times constraints. In order to delimit the work addressed in this research we will first present contributions concerning some of the main issues.…”
Section: Literature Reviewmentioning
confidence: 99%
“…This also means that the behaviour of the successive layers SCCMP (i) will also be cyclic. Due to the wide array of practical applications of multimodal processes (Bocewicz et al, 2014(Bocewicz et al, , 2015, these processes are characterised by many additional variables. In the context of the experiments conducted in this study (see Section 6), the following variables are found to be especially salient: resources R 4 and R 1 P 3…”
Section: Multimodal Processesmentioning
confidence: 99%
“…The concept of a multimodal process (Bocewicz et al, 2014) refers to a process that is executed using different modalities, e.g. associated with different transmission media enabling radio, fibre optics, or wire communication.…”
Section: Multimodal Processesmentioning
confidence: 99%
See 1 more Smart Citation