Automated contract time determination system for highway projects

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
4
1

Citation Types

0
16
0

Year Published

2012
2012
2021
2021

Publication Types

Select...
5
2

Relationship

0
7

Authors

Journals

citations
Cited by 15 publications
(16 citation statements)
references
References 2 publications
0
16
0
Order By: Relevance
“…Existing studies on generating activity sequences have been focused on utilizing the expertise of experienced schedulers or logical assumptions about construction activity sequences. For example, Jeong et al [8] developed fourteen different highway scheduling templates based on the Oklahoma DOT schedulers' experience. Bruce et al [5] utilized a list of controlling activities and developed templates based on experts' inputs for 12 types of road and bridge construction projects.…”
Section: Prior Studiesmentioning
confidence: 99%
See 1 more Smart Citation
“…Existing studies on generating activity sequences have been focused on utilizing the expertise of experienced schedulers or logical assumptions about construction activity sequences. For example, Jeong et al [8] developed fourteen different highway scheduling templates based on the Oklahoma DOT schedulers' experience. Bruce et al [5] utilized a list of controlling activities and developed templates based on experts' inputs for 12 types of road and bridge construction projects.…”
Section: Prior Studiesmentioning
confidence: 99%
“…Many academic studies have focused on the first two steps: a) identifying construction activities and b) determining activity durations using historical and reliable production rates to enhance the accuracy of schedule development [6,7]. Regarding determining the sequence of activities, many studies pointed out the heavy reliance of owners and contractors on the experience and knowledge of experienced schedulers as the single most crucial source [5,8].…”
Section: Introductionmentioning
confidence: 99%
“…Inefficient activity sequence identification results in inaccurate critical path of the project and project duration and contract time determination. Inaccurate estimation of the contract time can lead to an increase in construction cost, inconvenience to the public, and a raise in the number of litigations [2,3,4].…”
Section: Introductionmentioning
confidence: 99%
“…Research studies tried to address this issue. Typical activity dependency rules have been identified based on physical and material constraints by analysing construction drawing and using experts' knowledge [7,4]. A recent study developed a data mining model to analyse historical schedules to obtain common sequential patterns among activities [8].…”
Section: Introductionmentioning
confidence: 99%
See 1 more Smart Citation