2018
DOI: 10.1007/s42107-018-0026-3
|View full text |Cite
|
Sign up to set email alerts
|

Automated constructability rating framework for concrete formwork systems using building information modeling

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1
1

Citation Types

0
10
0

Year Published

2019
2019
2024
2024

Publication Types

Select...
9

Relationship

0
9

Authors

Journals

citations
Cited by 20 publications
(10 citation statements)
references
References 20 publications
0
10
0
Order By: Relevance
“…Kim et al (2009) developed an automatic system that generates interior wall finishes for accurate BIM-based quantity takeoff. Kannan and Santhi (2013) created parametric BIM components for concrete formwork and used them in a high-rise BIM model. Liu et al (2015Liu et al ( , 2018 reported an automatic system to generate the boarding layout of drywalls in a BIM model with the lowest material waste.…”
Section: Bim-based Quantity Takeoffmentioning
confidence: 99%
“…Kim et al (2009) developed an automatic system that generates interior wall finishes for accurate BIM-based quantity takeoff. Kannan and Santhi (2013) created parametric BIM components for concrete formwork and used them in a high-rise BIM model. Liu et al (2015Liu et al ( , 2018 reported an automatic system to generate the boarding layout of drywalls in a BIM model with the lowest material waste.…”
Section: Bim-based Quantity Takeoffmentioning
confidence: 99%
“…As for buildability, the keywords appear to be "ease of construction". Although constructability and buildability can be used interchangeably (Kannan and Santhi, 2018), differences between them can still be found. The researchers found that buildability concerns more on design (Khan, 2018) whereas constructability encompasses wider scope (Alinaitwe, Nyamutale, & Tindiwensi, 2014) and it embraces management functions/systems (JadidAlEslami et al, 2018).…”
Section: Definitions Of "Constructability" and "Buildability"mentioning
confidence: 99%
“…Kannan and Santhi [28] proposed using the BIM technique to rationalize the formwork layout, incorporating the actual site characteristics and imparting the parametric change during construction. Their paper also provides the background concepts and techniques required to adopt the BIM as a simplified and intriguing tool to carry out the 4D Schedule and 5D Cost of the concrete formwork systems.…”
Section: Formwork Selection Problemmentioning
confidence: 99%